Brownfield & Retired Power Plant Sites in Florida

90 catalogued brownfield and retired-generation sites in Florida, listed by former capacity. Each carries an existing utility-scale grid interconnection that a new datacenter load may be able to re-use.

At a glance

Florida has 90 brownfield and retired-generation sites in GridCensus: 86 retired power plants from EIA-860 and 4 EPA-tracked contaminated or reuse sites. Together they record 34,945 MW of existing or former generating capacity, 2nd among 50 states and DC. The largest by capacity is Martin at 3,623 MW.

What kinds of former sites are in Florida?

By former use, the list includes 41 natural gas, 23 oil, 11 coal, 7 biomass, 3 landfill, 2 hydroelectric and 3 other categories. Recorded retirement dates run from December 1998 to October 2024, with 37 retirements in 2015 or later. 77 of 84 sites with a measured distance sit within 2 miles of a transmission substation.

How does Florida compare with other states?

Florida ranks 6th of 50 states and DC by number of brownfield and retired-generation sites, out of 2,085 nationally. By recorded capacity (34,945 MW) it ranks 2nd, against 289,280 MW across all states. The state also has 4,344 scored datacenter candidate sites, 21 of them classed as brownfield sites, averaging 56 on the 0–100 DC Readiness scale.

Where in Florida are these sites?

All brownfield and retired plant sites in Florida

SiteFormer useCapacityRetiredCounty
Martinoil3,623 MW2018-12-01Martin
Levy Nuclear Plantnuclear2,500 MW—Levy
Polkgas1,859 MW—Polk
Crystal Rivercoal1,855 MW2018-12-01Citrus
Lauderdalegas1,795 MW2018-12-01Broward
Port Evergladesoil1,710 MW2016-12-01Broward
Seminole (FL)coal1,565 MW2024-01-01Putnam
St Johns River Power Parkcoal1,358 MW2018-01-01Duval
Midwaygas1,287 MW—Taylor
Unnamedgas1,159 MW——
Big Bendcoal1,066 MW2023-04-01Hillsborough
Hines Energy Complexgas1,034 MW—Polk
Tampa Electric Co NA 2gas982 MW—Hillsborough
Unsitedgas896 MW——
C D McIntosh Jrcoal881 MW2021-04-01Polk
Turkey Pointoil818 MW2016-10-01Miami Dade
Cape Canaveraloil804 MW2010-06-01Brevard
F J Gannoncoal635 MW2004-01-01Hillsborough
Rivieraoil621 MW2011-02-01Palm Beach
Fort Myersoil620 MW2016-12-01Lee
Putnamgas580 MW2014-12-01Putnam
Midulla Generating Stationoil555 MW—Hardee
Shady Hills Generating Stationgas518 MW—Pasco
H L Culbreath Bayside Power Stationgas504 MW—Hillsborough
P L Bartowoil494 MW2009-06-01Pinellas
Arvah B Hopkinsgas441 MW2018-11-01Leon
Indiantown Cogeneration LPcoal395 MW2020-12-01Martin
Lansing Smithcoal340 MW2016-03-01Bay
Curtis H Stanton Energy Centercoal329 MW—Orange
Cutlergas237 MW2012-11-01Miami Dade
Hookers Pointoil233 MW2003-01-01Hillsborough
Southside Generating Stationoil232 MW2001-10-01Duval
Greenland Energy Centergas230 MW—Duval
Tampa Electric Co NA 4gas200 MW——
NA 1gas195 MW——
G E Turneroil181 MW2016-03-01Volusia
J D Kennedyoil169 MW2009-04-01Duval
Sanfordoil156 MW2012-11-01Volusia
Higginsgas153 MW2019-12-01Pinellas
Suwannee Rivergas147 MW2016-12-01Suwannee
John R Kellygas143 MW2021-06-01Alachua
Henry D Kinggas142 MW2008-05-01St Lucie
Tampa Electric Co NA 3gas99 MW—Hillsborough
Scholzcoal98 MW2015-04-01Jackson
Gulf Clean Energy Centergas94 MW2006-05-01Escambia
S O Purdomgas80 MW2018-10-01Wakulla
Hanselgas73 MW2012-10-01Osceola
Central Energy Plantgas70 MW2024-10-01Orange
Wheelabrator North Browardwaste68 MW2015-07-01Broward
Avon Parkgas67 MW2020-10-01Highlands
DeBaryoil67 MW2016-12-01Volusia
Tom G Smithgas48 MW2000-07-01Palm Beach
Wheelabrator Ridge Energybiomass46 MW2019-01-01Polk
Jackson Millgas44 MW1998-12-01Duval
Phillipsoil42 MW2015-11-01Highlands
Clewiston Sugar Housebiomass41 MW2017-12-01Hendry
Bryant Sugar Housebiomass31 MW2007-04-01Palm Beach
J Woodruffhydro30 MW2003-02-01Gadsden
St Cloudgas30 MW2008-03-01Osceola
Larsen Memorialgas25 MW2003-01-01Polk
Georgia-Pacific Palatka Operationsbiomass24 MW2016-06-01Putnam
G W Iveygas23 MW2013-05-01Miami Dade
SRF Pulp Processing Facilitybiomass20 MW—Hendry
Rio Pinaroil19 MW2016-03-01Orange
Cutrale Citrus Juices USA IIgas17 MW2015-12-01Polk
Marathon Generating Plantoil14 MW2018-11-01Monroe
Kenneth P. Ksionek Community Solar Farm at the Stanton Energy Center (SEC)landfill13 MW——
Dinner Lakegas13 MW2003-01-01Highlands
Fernandina Plantbiomass13 MW2012-07-01Nassau
C H Corn Hydroelectric Facilityhydro12 MW2019-02-01Leon
Smith Streetoil12 MW2013-12-01Volusia
Portland (FL)oil11 MW2006-12-01Walton
Fernandina Beach Millcoal9 MW2003-12-01Nassau
Cutrale Citrus Juices USA Igas8 MW2016-01-01Lake
Stock Islandoil8 MW2009-12-01Monroe
Partnership Stationgas6 MW2015-11-01Hillsborough
Cudjoeoil5 MW2006-09-01Monroe
Central District Wastewater Treat Plantbiomass5 MW2014-11-01Miami Dade
W E Swoopeoil4 MW2013-12-01Volusia
Brevardgas3 MW2020-05-01Brevard
Girvin Landfillgas3 MW2014-02-01Duval
Big Pineoil3 MW2006-09-01Monroe
Baptist Medical Centergas3 MW2007-04-01Duval
Lake Worth Landfilllandfill2 MW——
G2 Energy Marion LLCgas2 MW2021-11-01Marion
Manatee County LFGTEgas2 MW2019-11-01Manatee
Seminole Energygas2 MW2019-12-01Seminole
Perdidogas2 MW—Escambia
USN Air Station Cecil Fieldsuperfund1 MW——
Bee Ridge Landfill / Rothenbach Parklandfill0 MW——

Frequently asked questions

How many retired power plants are in Florida?

GridCensus lists 86 retired power plant sites in Florida from EIA-860 retirement records. 69 have a recorded retirement date, 37 of them in 2015 or later.

What is the largest retired power plant or brownfield site in Florida?

Martin in Indiantown is the largest by recorded capacity, at 3,623 MW. It is followed by Levy Nuclear Plant (2,500 MW) and Polk (1,858.8 MW).

Which power plant in Florida retired most recently?

Central Energy Plant has the latest recorded retirement date in the state, October 2024, with 70 MW of capacity.

Which county in Florida has the most brownfield and retired plant sites?

Duval County has the most, with 7, followed by Hillsborough County with 7.

How many EPA brownfield sites in Florida have completed cleanup?

4 of the 4 EPA-tracked sites listed for Florida are recorded as cleanup complete.

Looking for a specific record? The directory lists every brownfield site, A to Z.

More on Florida, and states with similar counts

About this data

Source: EIA-860 retired generating units and EPA RE-Powering America's Land contaminated-site records, as published March 6, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Brownfield and retired power plant sites in Florida”, https://gridcensus.com/brownfield-sites/florida (data as of March 6, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for brownfield sites in Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.