Duval has 266 scored datacenter candidate sites averaging 60.2/100 DC Readiness, with a catalogued aggregate of 16,137 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
266
Candidate sites
60.2/100
Avg DC Readiness
16,137 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
Site-selection context for Duval
Yessales_tax_exemption
Datacenter tax incentive
10.97¢/kWh
Commercial electricity
7.84¢/kWh
Industrial electricity
16
Fiber providers
Low-Medium
Water stress
$13,486
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
By site type
Top datacenter sites in Duval
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Southside Generating Station | Brownfield | — | 232 MW | 3.6 yrs | 68.2 |
| HARTLEY | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 67.2 |
| FOREST | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 67.2 |
| DUVAL | Substation-Adjacent | 500 kV | 1,000 MW | 1.0 yrs | 66.8 |
| EC Near J D Kennedy | Greenfield | — | — | 3.6 yrs | 66.7 |
| UNKNOWN120509 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 66.5 |
| OZ Duval | Greenfield | — | — | 3.6 yrs | 66.4 |
| UNKNOWN120521 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 66.2 |
| ROBINWOOD | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.9 |
| GREENLAND | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.8 |
| EC Near Southside Generating Station | Greenfield | — | — | 3.6 yrs | 65.8 |
| EC Near J D Kennedy | Greenfield | — | — | 3.6 yrs | 65.8 |
| GREEN ENERGY CENTER | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.7 |
| WEST JAX | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.7 |
| CENTER PARK | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.6 |
| OZ Duval | Greenfield | — | — | 3.6 yrs | 65.5 |
| EC Near Southside Generating Station | Greenfield | — | — | 3.6 yrs | 65.4 |
| BARTRAM | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.3 |
| UNKNOWN120554 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.2 |
| EC Near J D Kennedy | Greenfield | — | — | 3.6 yrs | 65.2 |
| FIRESTONE | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.1 |
| NORTHSIDE | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.1 |
| FORT CAROLINE | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.0 |
| NORMANDY | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.0 |
| BLOUNT ISLAND | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 64.9 |
Duval datacenter FAQ
- How many datacenter sites are in Duval?
- 266 scored datacenter candidate sites, averaging 60.2/100 DC Readiness.
- Does Duval offer datacenter tax incentives?
- Sales tax exemption on manufacturing machinery including servers; no state income tax.
- What is the natural-hazard risk in Duval?
- FEMA's National Risk Index rates Duval as "Very High" (score 55).
- What are industrial electricity rates in Duval?
- Average industrial electricity is 7.84¢/kWh and commercial is 10.97¢/kWh in Duval.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Duval, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.