Datacenter Sites in Duval, Florida

Duval has 263 scored datacenter candidate sites averaging 58.3/100 DC Readiness, with a catalogued aggregate of 11,837 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

At a glance

Duval, Florida has 263 scored datacenter candidate sites averaging 58.3/100 DC Readiness, roughly in line with the Florida average of 56.0. It ranks 3rd of 66 Florida counties by number of sites and 6th by average score. The top-scoring site is Substation-Adjacent site · e0c77836 at 68.3/100.

263
Candidate sites
58.3/100
Avg DC Readiness
11,837 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Duval

Site-selection context for Duval

Yessales_tax_exemption
Datacenter tax incentive
10.97¢/kWh
Commercial electricity
7.84¢/kWh
Industrial electricity
16
Fiber providers
Low-Medium
Water stress
$13,486
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

How does Duval compare with other counties in Florida?

By number of scored sites, Duval ranks 3rd of the 66 Florida counties with a county page, holding 6.1% of the state's 4,344 sites. Its average DC Readiness of 58.3/100 ranks 6th in the state and is roughly in line with the national average of 53.0. Nationally it has the 66th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 219 score 55 or higher.

What types of datacenter sites are in Duval?

Industrial sites are the most common (149, 57% of the county's inventory), followed by substation-adjacent (61) and greenfield (41). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Duval?

Industrial electricity averages 7.84¢/kWh and commercial 10.97¢/kWh. FEMA's National Risk Index rates the county "Very High" (55). WRI water stress is low-medium. 16 fiber providers report service in the county. The climate runs 3,500 cooling degree days a year with a mean temperature of 72°F. Land is valued around $13,486 an acre.

By site type

Top datacenter sites in Duval

Top datacenter sites in Duval
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN120509Substation-Adjacent230 kV300 MW3.7 yrs68.3
DUVALSubstation-Adjacent500 kV1,000 MW3.7 yrs68.2
Southside Generating StationBrownfield—232 MW3.7 yrs67.9
HARTLEYSubstation-Adjacent230 kV300 MW3.7 yrs66.8
FORESTSubstation-Adjacent230 kV300 MW3.7 yrs66.6
GREEN ENERGY CENTERSubstation-Adjacent230 kV300 MW3.7 yrs66.4
EC Near J D KennedyGreenfield——3.7 yrs66.0
UNKNOWN120521Substation-Adjacent230 kV300 MW3.7 yrs65.9
GREENLANDSubstation-Adjacent230 kV300 MW3.7 yrs65.8
OZ DuvalGreenfield——3.7 yrs65.8
WEST JAXSubstation-Adjacent230 kV300 MW3.7 yrs65.8
NORTHSIDESubstation-Adjacent230 kV300 MW3.7 yrs65.6
BLOUNT ISLANDSubstation-Adjacent230 kV300 MW3.7 yrs65.5
BARTRAMSubstation-Adjacent230 kV300 MW3.7 yrs65.5
ROBINWOODSubstation-Adjacent230 kV300 MW3.7 yrs65.4
WEST LAKESubstation-Adjacent230 kV300 MW3.7 yrs65.4
NORMANDYSubstation-Adjacent230 kV300 MW3.7 yrs65.3
CENTER PARKSubstation-Adjacent230 kV300 MW3.7 yrs65.2
EC Near Southside Generating StationGreenfield——3.7 yrs65.2
FORT CAROLINESubstation-Adjacent230 kV300 MW3.7 yrs65.2
FIRESTONESubstation-Adjacent230 kV300 MW3.7 yrs65.2
UNKNOWN120554Substation-Adjacent230 kV300 MW3.7 yrs65.2
TAP151528Substation-Adjacent230 kV300 MW3.7 yrs64.9
EC Near J D KennedyGreenfield——3.7 yrs64.9
OZ DuvalGreenfield——3.7 yrs64.8

Every scored site in Duval

All 263 sites, best first.

Duval datacenter FAQ

How many datacenter sites are in Duval?

263 scored datacenter candidate sites, averaging 58.3/100 DC Readiness. That is the 3rd-most of 66 Florida counties with five or more sites.

What is the highest-scoring datacenter site in Duval?

Substation-Adjacent site · e0c77836 scores 68.3/100 DC Readiness, the highest of the 263 scored sites in Duval (a substation-adjacent site).

Does Duval offer datacenter tax incentives?

Sales tax exemption on manufacturing machinery including servers; no state income tax.

What is the natural-hazard risk in Duval?

FEMA's National Risk Index rates Duval as "Very High" (score 55).

What are industrial electricity rates in Duval?

Average industrial electricity is 7.84¢/kWh and commercial is 10.97¢/kWh in Duval.

More in Florida

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Duval, Florida”, https://gridcensus.com/datacenter-sites/florida/duval (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Duval, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.