MANDARIN is a substation-adjacent datacenter candidate site in Duval, Florida, interconnecting through SERC. It screens at 61.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMANDARIN
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW

Speed to power

Interconnection outlookModerate
≈ 4.6 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait4.6 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPScaleMatrix Jacksonville Data Center US-South 02
IXP distance4.6 mi
Fiber providers16
Fiber coverage72.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterTierPoint Jacksonville
DC distance4.6 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.97¢/kWh
Industrial electricity7.84¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$13,486

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track MANDARIN

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
65
Fiber connectivity12%
89
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Duval, ranked by DC Readiness.

Sites near MANDARIN
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN120509Substation-Adjacent230 kV300 MW3.7 yrs68.3
DUVALSubstation-Adjacent500 kV1,000 MW3.7 yrs68.2
Southside Generating StationBrownfield—232 MW3.7 yrs67.9
HARTLEYSubstation-Adjacent230 kV300 MW3.7 yrs66.8
FORESTSubstation-Adjacent230 kV300 MW3.7 yrs66.6
GREEN ENERGY CENTERSubstation-Adjacent230 kV300 MW3.7 yrs66.4
EC Near J D KennedyGreenfield——3.7 yrs66.0
UNKNOWN120521Substation-Adjacent230 kV300 MW3.7 yrs65.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for MANDARIN, Duval is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.