EC Near Southside Generating Station
GreenfieldDuval, Florida · SERC
EC Near Southside Generating Station is a greenfield datacenter candidate site in Duval, Florida, interconnecting through SERC. It screens at 64.9/100 DC Readiness and a 3.6 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Duval, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| BARTRAM | Substation-Adjacent | 230 kV | 300 MW | 3.6 yrs | 75.6 |
| UNKNOWN120521 | Substation-Adjacent | 230 kV | 300 MW | 3.6 yrs | 75.0 |
| UNKNOWN120554 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 74.1 |
| UNKNOWN120519 | Substation-Adjacent | 230 kV | 300 MW | 3.6 yrs | 74.1 |
| FORT CAROLINE | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 73.5 |
| BLOUNT ISLAND | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 73.2 |
| TAP161532 | Substation-Adjacent | 230 kV | 300 MW | 3.6 yrs | 73.2 |
| TAP151528 | Substation-Adjacent | 230 kV | 300 MW | 3.6 yrs | 72.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for EC Near Southside Generating Station, Duval. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.