Greenfield Datacenter Sites

At a glance

GridCensus scores 18,112 greenfield datacenter candidate sites across the US — 12% of all 147,272 scored sites and the 4th-largest of 9 site types. They average 55.3/100 on the DC Readiness Score, the 3rd-highest of 9 types (national average 53.0). Texas has the most, with 1,276.

Undeveloped land with no prior industrial use. Greenfield parcels offer maximum design flexibility and large contiguous footprints, but typically require full utility build-out — the speed-to-power story hinges on proximity to existing transmission.

18,112
Candidate sites
55.3/100
Avg DC Readiness
655.9k MW
Catalogued capacity
theoretical aggregate
4.3 yrs
Avg queue wait

How do greenfield sites compare with other site types?

Greenfield sites are the 4th-largest of 9 site types by count and the 3rd-highest of 9 by average DC Readiness. Their 55.3 average is above the 53.0 average across all 147,272 sites. The average interconnection-queue wait in their markets, 4.3 yrs, is the 5th-shortest of 9. The greenfield category is strongest on water, averaging 75.6 against a national average of 72.3; its weakest factor is hazard resilience, at 59.4 versus 66.8 nationally.

Where are greenfield datacenter sites located?

The five states with the most are Texas (1,276, 7%), Pennsylvania (973, 5%), California (941, 5%), Illinois (913, 5%) and Florida (791, 4%). Greenfield sites appear in 51 states. By grid region, MISO holds 27%, PJM holds 21% and SERC holds 18%.

Average sub-score profile

Power availability
31.4
Speed-to-power
50.5
Fiber
65.0
Water
75.6
Hazard resilience
59.4

Top 25 greenfield datacenter sites

Top Greenfield datacenter sites
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near HaeflingGreenfieldKYFayette——3.9 yrs68.2
EC Near W B TuttleGreenfieldTXBexar——3.5 yrs68.1
EC Near Nueces BayGreenfieldTXNueces——3.5 yrs68.1
OZ HamiltonGreenfieldTNHamilton——3.9 yrs67.8
EC Coal Webb CountyGreenfieldTXWebb County——3.5 yrs67.7
EC FFE Tarrant CountyGreenfieldTXTarrant County——3.5 yrs67.7
EC Near ZornGreenfieldKYJefferson——3.9 yrs67.6
OZ TarrantGreenfieldTXTarrant——3.5 yrs67.4
EC Near Tessman RoadGreenfieldTXBexar——3.5 yrs67.4
EC Near SpencerGreenfieldTXDenton——3.5 yrs67.4
EC Coal Sheridan CountyGreenfieldWYSheridan County——4.3 yrs67.3
OZ HamiltonGreenfieldTNHamilton——3.9 yrs67.3
EC Near Mission RoadGreenfieldTXBexar——3.5 yrs67.3
OZ GreeneGreenfieldMOGreene——4.3 yrs67.2
OZ NuecesGreenfieldTXNueces——3.5 yrs67.2
EC Near Tampa Electric Co NA 2GreenfieldFLHillsborough——3.7 yrs67.2
EC Near Domain Integrated Energy SystemGreenfieldTXTravis——3.5 yrs67.2
EC Near LaredoGreenfieldTXWebb——3.5 yrs67.2
OZ DavidsonGreenfieldTNDavidson——3.9 yrs67.2
OZ JeffersonGreenfieldKYJefferson——3.9 yrs67.2
OZ TarrantGreenfieldTXTarrant——3.5 yrs67.1
OZ KnoxGreenfieldTNKnox——3.9 yrs67.1
EC Coal Sheridan CountyGreenfieldWYSheridan County——4.3 yrs67.1
OZ HamiltonGreenfieldTNHamilton——3.9 yrs67.1
EC Near Skyline Gas RecoveryGreenfieldTXDallas——3.5 yrs67.1

What do the top-scoring greenfield sites have in common?

The top 25 greenfield sites score between 67.1 and 68.2. 13 are in Texas, 5 are in Tennessee and 3 are in Kentucky. Their counties have a median of 13 fixed fiber broadband providers in FCC data. The median distance to the nearest internet exchange facility is 4 km. The median interconnection-queue wait in their markets is 3.5 years. None of the 25 with a mapped FEMA flood zone sits in a high-risk (A or V) zone. 3 lie within 25 km of a binding transmission constraint.

Greenfield site FAQ

What is a greenfield datacenter site?

Undeveloped land with no prior industrial use. Greenfield parcels offer maximum design flexibility and large contiguous footprints, but typically require full utility build-out — the speed-to-power story hinges on proximity to existing transmission.

How many greenfield datacenter sites are there?

GridCensus catalogs 18,112 greenfield candidate sites nationwide, averaging 55.3/100 DC Readiness — 12% of all scored sites.

Which state has the most greenfield datacenter sites?

Texas leads with 1,276 greenfield candidate sites, followed by Pennsylvania with 973.

What is the highest-scoring greenfield datacenter site?

EC Near Haefling in Fayette, Kentucky has the highest DC Readiness Score of any greenfield site, at 68.2/100.

How long is the interconnection queue for greenfield sites?

Greenfield candidate sites sit in markets with an average interconnection-queue wait of 4.3 yrs, the 5th-shortest of 9 site types.

Other datacenter site types

By grid region

Dataset updated . Screening estimates derived from public data sources.

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Greenfield datacenter candidate sites”, https://gridcensus.com/site-types/greenfield (data as of November 12, 2026).

Go deeper than the public screen

Every site and score for Greenfield sites is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.