Greenfield Datacenter Sites in Tennessee
Tennessee has 799 greenfield datacenter candidate sites. Undeveloped land with no prior industrial use. Greenfield parcels offer maximum design flexibility and large contiguous footprints, but typically require full utility build-out — the speed-to-power story hinges on proximity to existing transmission.
799
Greenfield sites
67.1/100
Avg score (top 25)
Tennessee
State
Greenfield
Type
Top greenfield sites in Tennessee
| Site | Type | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|
| OZ Hamilton | Greenfield | Hamilton | — | — | 3.7 yrs | 69.6 |
| OZ Hamilton | Greenfield | Hamilton | — | — | 3.7 yrs | 69.0 |
| OZ Davidson | Greenfield | Davidson | — | — | 3.7 yrs | 69.0 |
| OZ Hamilton | Greenfield | Hamilton | — | — | 3.7 yrs | 68.8 |
| OZ Knox | Greenfield | Knox | — | — | 3.7 yrs | 68.8 |
| OZ Davidson | Greenfield | Davidson | — | — | 3.7 yrs | 68.7 |
| OZ Knox | Greenfield | Knox | — | — | 3.7 yrs | 68.5 |
| OZ Shelby | Greenfield | Shelby | — | — | 3.7 yrs | 67.7 |
| EC Near Vanderbilt University Power Plant | Greenfield | Davidson | — | — | 3.7 yrs | 67.4 |
| EC Near Allen | Greenfield | Shelby | — | — | 3.7 yrs | 67.0 |
| OZ Shelby | Greenfield | Shelby | — | — | 3.7 yrs | 66.8 |
| OZ Shelby | Greenfield | Shelby | — | — | 3.7 yrs | 66.8 |
| OZ Knox | Greenfield | Knox | — | — | 3.7 yrs | 66.8 |
| OZ Shelby | Greenfield | Shelby | — | — | 3.7 yrs | 66.7 |
| OZ Davidson | Greenfield | Davidson | — | — | 3.7 yrs | 66.5 |
| Greenfield (DAVIDSON - CUMBERLAND 500KV) | Greenfield | Cheatham County | 500 kV | 1,000 MW | 1.0 yrs | 66.5 |
| OZ Montgomery | Greenfield | Montgomery | — | — | 3.7 yrs | 66.2 |
| OZ Knox | Greenfield | Knox | — | — | 3.7 yrs | 66.2 |
| OZ Shelby | Greenfield | Shelby | — | — | 3.7 yrs | 66.1 |
| OZ Hamilton | Greenfield | Hamilton | — | — | 3.7 yrs | 65.9 |
| EC Near MTSU Power Co-Gen Plant | Greenfield | Rutherford | — | — | 3.7 yrs | 65.9 |
| OZ Hamblen | Greenfield | Hamblen | — | — | 3.7 yrs | 65.9 |
| EC Near MTSU Power Co-Gen Plant | Greenfield | Rutherford | — | — | 3.7 yrs | 65.9 |
| OZ Hamblen | Greenfield | Hamblen | — | — | 3.7 yrs | 65.6 |
| OZ Loudon | Greenfield | Loudon | — | — | 3.7 yrs | 65.6 |
- How many greenfield datacenter sites are in Tennessee?
- GridCensus catalogs 799 greenfield datacenter candidate sites in Tennessee.
- What is a greenfield datacenter site?
- Undeveloped land with no prior industrial use. Greenfield parcels offer maximum design flexibility and large contiguous footprints, but typically require full utility build-out — the speed-to-power story hinges on proximity to existing transmission.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Greenfield sites in Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.