Greenfield (DAVIDSON - CUMBERLAND 500KV)

Greenfield

Cheatham County, Tennessee · SERC

DC Readiness
67.6
Good / 100

Greenfield (DAVIDSON - CUMBERLAND 500KV) is a greenfield datacenter candidate site in Cheatham County, Tennessee, interconnecting through SERC. It screens at 67.6/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationDAVIDSON
Substation voltage500 kV
Available capacity1,000 MW
UtilityNASHVILLE ELECTRIC SERVICEmunicipalfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPLevel(3) Nashville (9th Ave)
IXP distance12.6 mi
Fiber providers5
Fiber coverage83.1%

Site characteristics

Site typeGreenfield
Land contactCheatham County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterLevel(3) Nashville (9th Ave)
DC distance12.6 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.65¢/kWh
Industrial electricity6.64¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$6,673

Regulatory climate

Favorablestate posture · as of 2026-08

TVA territory, DC-friendly; fast vertically-integrated interconnection.

DC tax incentiveYes
Large-load threshold≥ 50 MW

TVA infrastructure-cost provisions apply to very large loads.

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (DAVIDSON - CUMBERLAND 500KV)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power20%
73
Fiber connectivity12%
87
Energy cost10%
50
Water risk7%
90
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Cheatham County, ranked by DC Readiness.

Sites near Greenfield (DAVIDSON - CUMBERLAND 500KV)
SiteTypeVoltageCapacityQueue waitScore
ASHLAND CITYSubstation-Adjacent161 kV100 MW1.0 yrs65.7
TAP155279Substation-Adjacent161 kV100 MW1.0 yrs65.7
BEARWALLOWSubstation-Adjacent161 kV100 MW1.0 yrs65.6
KINGSTON SPRINGSSubstation-Adjacent161 kV100 MW1.0 yrs64.9
OZ CheathamGreenfield——3.7 yrs64.3
OAK PLAINSSubstation-Adjacent161 kV100 MW1.0 yrs63.8
PLEASANT VIEWSubstation-Adjacent69 kV50 MW1.0 yrs61.8
Greenfield (MONTGOMERY - DAVIDSON)Greenfield500 kV1,000 MW8.2 yrs61.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (DAVIDSON - CUMBERLAND 500KV), Cheatham County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.