OZ Davidson

Greenfield

Davidson County, Tennessee · SERC

DC Readiness
63.7
Good / 100

OZ Davidson is a greenfield datacenter candidate site in Davidson County, Tennessee, interconnecting through SERC. It screens at 63.7/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.10¢/kWh
UtilityNASHVILLE ELECTRIC SERVICEmunicipalfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.7 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.9 yrs
Recent queue wait4.7 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPPeace Communications NSH2
IXP distance3.5 mi
Fiber providers13
Fiber coverage85.1%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance335.5 mi

Site characteristics

Site typeGreenfield
Parcel ownerMetro Gov'T
Land contactDavidson County Assessor
Parcel APN16300042100
Land owner typeprivate
Buildability50.0/100

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteOKLAHOMA INSTALLATION COMPANY DILLARDS
Hazard sub-score52/100
Construction cost index110.5 (avg 100)

Location context

Nearest datacenterDatacenter 00819981888
DC distance1.8 mi
Nearest rail0.7 mi
Nearest gas pipeline0.4 mi
Nearest fiber route256.5 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.70¢/kWh
Industrial electricity6.28¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$12,414

Regulatory climate

Favorablestate posture · as of 2026-08

TVA territory, DC-friendly; fast vertically-integrated interconnection.

DC tax incentiveYes
Large-load threshold≥ 50 MW

TVA infrastructure-cost provisions apply to very large loads.

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Davidson

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
59
Fiber connectivity12%
96
Energy cost10%
90
Water risk7%
89
Natural hazard6%
52
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
47
Construction cost3%
58
Gas pipeline2%
99
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Davidson County, ranked by DC Readiness.

Sites near OZ Davidson
SiteTypeVoltageCapacityQueue waitScore
PIN HOOKSubstation-Adjacent500 kV1,000 MW3.9 yrs72.8
Music City SolarBrownfield—2 MW3.9 yrs69.3
OZ DavidsonGreenfield——3.9 yrs67.2
OZ DavidsonGreenfield——3.9 yrs66.9
EC Near Vanderbilt University Power PlantGreenfield——3.9 yrs65.7
TAP152141Substation-Adjacent161 kV100 MW3.9 yrs65.3
ELYSLANSubstation-Adjacent161 kV100 MW3.9 yrs65.3
UNKNOWN120838Substation-Adjacent161 kV100 MW3.9 yrs65.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for OZ Davidson, Davidson County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.