Greenfield Datacenter Sites in California
At a glance
Undeveloped land with no prior industrial use. Greenfield parcels offer maximum design flexibility and large contiguous footprints, but typically require full utility build-out — the speed-to-power story hinges on proximity to existing transmission.
Top greenfield sites in California
| Site | Type | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|
| EC Near Grayson | Greenfield | Los Angeles | — | — | 7.6 yrs | 56.5 |
| EC Near Scattergood | Greenfield | Los Angeles | — | — | 7.6 yrs | 56.3 |
| EC Near Central Utilities Plant LAX | Greenfield | Los Angeles | — | — | 7.6 yrs | 56.1 |
| OZ Fresno | Greenfield | Fresno | — | — | 7.6 yrs | 56.0 |
| EC Near UCLA So Campus Cogen Project | Greenfield | Los Angeles | — | — | 7.6 yrs | 55.9 |
| OZ Los Angeles | Greenfield | Los Angeles | — | — | 7.6 yrs | 55.8 |
| EC Near SF State University | Greenfield | San Francisco | — | — | 7.6 yrs | 55.8 |
| OZ Ventura | Greenfield | Ventura | — | — | 7.6 yrs | 55.8 |
| OZ Alameda | Greenfield | Alameda | — | — | 7.6 yrs | 55.8 |
| EC Near Puente Hills Energy Recovery | Greenfield | Los Angeles | — | — | 7.6 yrs | 55.8 |
| OZ Los Angeles | Greenfield | Los Angeles | — | — | 7.6 yrs | 55.6 |
| EC Near Scattergood | Greenfield | Los Angeles | — | — | 7.6 yrs | 55.5 |
| EC Near Long Beach Generation LLC | Greenfield | Los Angeles | — | — | 7.6 yrs | 55.5 |
| OZ Los Angeles | Greenfield | Los Angeles | — | — | 7.6 yrs | 55.5 |
| OZ San Diego | Greenfield | San Diego | — | — | 7.6 yrs | 55.5 |
| EC Near Anaheim GT | Greenfield | Orange | — | — | 7.6 yrs | 55.5 |
| OZ Stanislaus | Greenfield | Stanislaus | — | — | 7.6 yrs | 55.4 |
| EC Near CSU East Bay | Greenfield | Alameda | — | — | 7.6 yrs | 55.4 |
| OZ Los Angeles | Greenfield | Los Angeles | — | — | 7.6 yrs | 55.4 |
| EC Near Hunters Point | Greenfield | San Francisco | — | — | 7.6 yrs | 55.4 |
| EC Near Toyon Power Station | Greenfield | Los Angeles | — | — | 7.6 yrs | 55.4 |
| EC Near P Plant | Greenfield | San Diego | — | — | 7.6 yrs | 55.3 |
| OZ Los Angeles | Greenfield | Los Angeles | — | — | 7.6 yrs | 55.3 |
| OZ Alameda | Greenfield | Alameda | — | — | 7.6 yrs | 55.3 |
| EC Near Central Utilities Plant LAX | Greenfield | Los Angeles | — | — | 7.6 yrs | 55.3 |
How does California compare with other states for greenfield sites?
With 939 sites, California ranks 4th of the 51 states that have any greenfield candidate sites. Texas leads with 1,256. Nationally, greenfield sites average 55.5/100 DC Readiness, above the 53.0 average across all site types. Across every site type, California averages 45.3, the 52nd-highest of 52 states, and its candidate sites face an average interconnection-queue wait of 7.6 years.
Where are the highest-scoring greenfield sites in California?
The top 25 range from 56.5 to 55.3 on the 0–100 DC Readiness Score. They are concentrated in Los Angeles (14), Alameda (3), San Francisco (2) and San Diego (2). By grid region, 19 are in CAISO and 6 are in WECC.
County pages: Los Angeles · Alameda · San Francisco · San Diego
What power, fiber and flood exposure do these greenfield sites have?
Their counties have a median of 25 fixed fiber broadband providers in FCC data. The median distance to the nearest internet exchange facility is 5 km. The median interconnection-queue wait in their markets is 7.6 years. None of the 25 with a mapped FEMA flood zone sits in a high-risk (A or V) zone. 4 lie within 25 km of a binding transmission constraint.
Frequently asked questions
How many greenfield datacenter sites are in California?
GridCensus catalogs 939 greenfield datacenter candidate sites in California, 5% of the national total for this type (4th of 51 states).
What is a greenfield datacenter site?
Undeveloped land with no prior industrial use. Greenfield parcels offer maximum design flexibility and large contiguous footprints, but typically require full utility build-out — the speed-to-power story hinges on proximity to existing transmission.
What is the best greenfield datacenter site in California?
By DC Readiness Score, EC Near Grayson in Los Angeles ranks first at 56.5/100, followed by EC Near Scattergood in Los Angeles at 56.3.
Which California counties have the best greenfield sites?
The top 25 greenfield sites in California are concentrated in Los Angeles (14), Alameda (3), San Francisco (2) and San Diego (2).
How does California score for datacenters overall?
All 8,489 scored sites in California average 45.3/100 DC Readiness, the 52nd-highest of 52 states, against a national average of 53.0.
More on greenfield sites and California
- All datacenter sites in California· 8,489 sites
- Greenfield datacenter sites nationwide· 18,112 sites
- Federal Excess sites in California· 3,212 sites
- Industrial sites in California· 2,201 sites
- Substation-Adjacent sites in California· 1,573 sites
- Former Mine sites in California· 451 sites
- Brownfield sites in California· 104 sites
- Military BRAC sites in California· 9 sites
Greenfield sites in other states
- Greenfield sites in Texas· 1,256 sites
- Greenfield sites in Pennsylvania· 959 sites
- Greenfield sites in Illinois· 952 sites
- Greenfield sites in Florida· 785 sites
- Greenfield sites in Michigan· 716 sites
- Greenfield sites in Ohio· 694 sites
- Greenfield sites in Kentucky· 624 sites
- Greenfield sites in Minnesota· 603 sites
Dataset updated . Screening estimates derived from public data sources.
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 22, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Greenfield datacenter sites in California”, https://gridcensus.com/site-types/greenfield/california (data as of November 22, 2026).
Go deeper than the public screen
Every site and score for Greenfield sites in California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.