Skip to content
Gridcensus

Greenfield Datacenter Sites in Florida

Florida has 791 greenfield datacenter candidate sites. Undeveloped land with no prior industrial use. Greenfield parcels offer maximum design flexibility and large contiguous footprints, but typically require full utility build-out — the speed-to-power story hinges on proximity to existing transmission.

791
Greenfield sites
67.4/100
Avg score (top 25)
Florida
State
Greenfield
Type

Top greenfield sites in Florida

Top Greenfield sites in Florida
SiteTypeCountyVoltageCapacityQueue waitScore
EC Near Tampa Electric Co NA 2GreenfieldHillsborough——3.6 yrs68.9
OZ Miami-DadeGreenfieldMiami-Dade——3.6 yrs68.1
OZ BrowardGreenfieldBroward——3.6 yrs68.0
OZ PolkGreenfieldPolk——3.6 yrs67.9
OZ Miami-DadeGreenfieldMiami-Dade——3.6 yrs67.7
OZ HillsboroughGreenfieldHillsborough——3.6 yrs67.6
EC Near J D KennedyGreenfieldDuval——3.6 yrs67.6
OZ HillsboroughGreenfieldHillsborough——3.6 yrs67.6
OZ OrangeGreenfieldOrange——3.6 yrs67.5
OZ Miami-DadeGreenfieldMiami-Dade——3.6 yrs67.5
OZ Miami-DadeGreenfieldMiami-Dade——3.6 yrs67.5
OZ DuvalGreenfieldDuval——3.6 yrs67.4
Greenfield (CORDOVA - AURORA)GreenfieldFayette County500 kV1,000 MW1.0 yrs67.4
EC Near Hookers PointGreenfieldHillsborough——3.6 yrs67.4
OZ Miami-DadeGreenfieldMiami-Dade——3.6 yrs67.3
EC Near Larsen MemorialGreenfieldPolk——3.6 yrs67.2
OZ Miami-DadeGreenfieldMiami-Dade——3.6 yrs67.2
EC Near Tampa Electric Co NA 2GreenfieldHillsborough——3.6 yrs67.2
OZ PolkGreenfieldPolk——3.6 yrs67.1
OZ Miami-DadeGreenfieldMiami-Dade——3.6 yrs67.0
EC Near Tampa Electric Co NA 2GreenfieldHillsborough——3.6 yrs67.0
OZ OrangeGreenfieldOrange——3.6 yrs66.8
EC Near Southside Generating StationGreenfieldDuval——3.6 yrs66.8
OZ OrangeGreenfieldOrange——3.6 yrs66.7
OZ OrangeGreenfieldOrange——3.6 yrs66.7
How many greenfield datacenter sites are in Florida?
GridCensus catalogs 791 greenfield datacenter candidate sites in Florida.
What is a greenfield datacenter site?
Undeveloped land with no prior industrial use. Greenfield parcels offer maximum design flexibility and large contiguous footprints, but typically require full utility build-out — the speed-to-power story hinges on proximity to existing transmission.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield sites in Florida. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.