Skip to content
Gridcensus

Greenfield Datacenter Sites in Iowa

Iowa has 1,018 greenfield datacenter candidate sites. Undeveloped land with no prior industrial use. Greenfield parcels offer maximum design flexibility and large contiguous footprints, but typically require full utility build-out — the speed-to-power story hinges on proximity to existing transmission.

1,018
Greenfield sites
67.0/100
Avg score (top 25)
Iowa
State
Greenfield
Type

Top greenfield sites in Iowa

Top Greenfield sites in Iowa
SiteTypeCountyVoltageCapacityQueue waitScore
EC Near University of Iowa Main Power PlantGreenfieldJohnson1.4 yrs68.2
OZ PolkGreenfieldPolk1.4 yrs68.1
OZ WoodburyGreenfieldWoodbury1.4 yrs68.0
EC Coal Scott CountyGreenfieldScott County1.4 yrs67.9
EC Near Iowa State UniversityGreenfieldStory1.4 yrs67.8
OZ Black HawkGreenfieldBlack Hawk1.4 yrs67.7
EC Near Iowa State UniversityGreenfieldStory1.4 yrs67.6
EC Coal Woodbury CountyGreenfieldWoodbury County1.4 yrs67.6
EC Near RiversideGreenfieldScott1.4 yrs67.5
EC Near Waverly Municipal Electric North PlantGreenfieldBremer1.4 yrs67.4
EC Near RiversideGreenfieldScott1.4 yrs67.2
EC Near Walter Scott Jr Energy CenterGreenfieldPottawattamie1.4 yrs67.1
EC Near RiversideGreenfieldScott1.4 yrs67.1
EC Near Metro Methane Recovery FacilityGreenfieldPolk1.4 yrs67.0
EC Near RiversideGreenfieldScott1.4 yrs66.9
EC Coal Pottawattamie CountyGreenfieldPottawattamie County1.4 yrs66.8
EC Near Iowa State UniversityGreenfieldStory1.4 yrs66.6
EC Near RiversideGreenfieldScott1.4 yrs66.5
EC Near RiversideGreenfieldScott1.4 yrs66.3
EC Near Metro Methane Recovery FacilityGreenfieldPolk1.4 yrs66.2
EC Near Lake MillsGreenfieldWinnebago1.4 yrs66.1
EC Near George Neal NorthGreenfieldWoodbury1.4 yrs66.0
EC Near Metro Methane Recovery FacilityGreenfieldPolk1.4 yrs66.0
EC Near Metro Methane Recovery FacilityGreenfieldPolk1.4 yrs65.8
EC Near Waverly Municipal Electric North PlantGreenfieldBremer1.4 yrs65.8
How many greenfield datacenter sites are in Iowa?
GridCensus catalogs 1,018 greenfield datacenter candidate sites in Iowa.
What is a greenfield datacenter site?
Undeveloped land with no prior industrial use. Greenfield parcels offer maximum design flexibility and large contiguous footprints, but typically require full utility build-out — the speed-to-power story hinges on proximity to existing transmission.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield sites in Iowa. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.