ISO-NE Datacenter Sites

ISO New England

At a glance

ISO-NE (ISO New England) contains 5,817 of the 147,272 datacenter candidate sites GridCensus scores — 4% of the national total and the 7th-largest of 9 grid regions by site count. Its sites average 54.7/100 on the DC Readiness Score (national average 53.0), the 4th-highest of 9 regions. Projects near these sites wait an average of 4.3 yrs in the interconnection queue.

ISO New England coordinates the six-state Northeast. Winter peaking, constrained gas supply, and limited land keep it a niche datacenter market, but proximity to Boston drives latency-sensitive demand.

5,817
Candidate sites
54.7/100
Avg DC Readiness
146.0k MW
Catalogued capacity
theoretical aggregate
4.3 yrs
Avg queue wait

How does ISO-NE compare with other grid regions?

By site count ISO-NE is the 7th-largest of 9 regions GridCensus tracks, with 5,817 candidate sites. Its average DC Readiness of 54.7 is the 4th-highest of 9, above the 53.0 national average. The average interconnection-queue wait of 4.3 yrs is the 7th-shortest of 9. Sites here see an average queue depth of 11 projects at their nearest point of interconnection. Catalogued substation capacity near these sites sums to 146.0k MW, a theoretical aggregate rather than available headroom.

Which states and site types make up ISO-NE?

Massachusetts (1,859 sites, 32%), Maine (1,183 sites, 20%) and Connecticut (917 sites, 16%) hold the largest shares of the region's candidate sites. By type, industrial sites make up 58% (3,389; 24% nationally), substation-adjacent sites make up 15% (881; 26% nationally) and former mine sites make up 13% (728; 18% nationally).

What are ISO-NE sites strongest and weakest on?

ISO-NE is strongest on water, averaging 90.6 against a national average of 72.3; its weakest factor is power availability, at 34.4 versus 37.4 nationally. Each factor is scored 0–100, where higher is better (for water and hazard, higher means lower stress and lower risk).

Power availability
34.4
Speed-to-power
47.3
Fiber
79.8
Water
90.6
Hazard resilience
79.6

Top 25 datacenter sites in ISO-NE

Top datacenter sites in ISO-NE
SiteTypeStateCountyVoltageCapacityQueue waitScore
K STREETSubstation-AdjacentMASuffolk County345 kV600 MW4.3 yrs72.4
MYSTICSubstation-AdjacentMASuffolk County345 kV600 MW4.3 yrs72.4
BRIDGEPORT RESCOSubstation-AdjacentCTGreater Bridgeport Planning Region345 kV600 MW4.3 yrs71.7
Manchester LandfillBrownfieldNHHillsborough—3 MW4.3 yrs70.2
WEST RUTLANDSubstation-AdjacentVTRutland County345 kV600 MW4.3 yrs68.9
NEW HAVEN HARBORSubstation-AdjacentCTSouth Central Connecticut Planning Region345 kV600 MW4.3 yrs68.8
Thornton Heights CommonBrownfieldMECumberland—0 MW4.3 yrs68.7
UNKNOWN135915Substation-AdjacentCTSoutheastern Connecticut Planning Region345 kV600 MW4.3 yrs68.6
UNKNOWN133485Substation-AdjacentMAHampden County345 kV600 MW4.3 yrs68.5
FROST BRIDGESubstation-AdjacentCTNaugatuck Valley Planning Region345 kV600 MW4.3 yrs68.5
TAP136499Substation-AdjacentCTCapitol Planning Region345 kV600 MW4.3 yrs68.4
MONTVILLESubstation-AdjacentCTSoutheastern Connecticut Planning Region345 kV600 MW4.3 yrs68.4
UNKNOWN133682Substation-AdjacentMAMiddlesex County450 kV600 MW4.3 yrs68.3
MANCHESTERSubstation-AdjacentCTCapitol Planning Region345 kV600 MW4.3 yrs68.3
NO. WALLSubstation-AdjacentCTLower Connecticut River Valley Planning Region345 kV600 MW4.3 yrs68.2
EAGLESubstation-AdjacentNHHillsborough County345 kV600 MW4.3 yrs68.2
KINGSTON STREETSubstation-AdjacentMASuffolk County345 kV600 MW4.3 yrs68.2
PLUMTREESubstation-AdjacentCTWestern Connecticut Planning Region345 kV600 MW4.3 yrs68.2
NORTH CAMBRIDGESubstation-AdjacentMASuffolk County345 kV600 MW4.3 yrs68.1
BARBOUR HILLSubstation-AdjacentCTCapitol Planning Region345 kV600 MW4.3 yrs67.9
WAKEFIELD JUNCTIONSubstation-AdjacentMASuffolk County345 kV600 MW4.3 yrs67.9
NORTH BLOOMFIELDSubstation-AdjacentCTCapitol Planning Region345 kV600 MW4.3 yrs67.9
UNKNOWN137065Substation-AdjacentNHHillsborough County230 kV300 MW4.3 yrs67.8
AMHERSTSubstation-AdjacentNHHillsborough County345 kV600 MW4.3 yrs67.8
SOUTHINGTONSubstation-AdjacentCTNaugatuck Valley Planning Region345 kV600 MW4.3 yrs67.8

ISO-NE FAQ

What is ISO-NE?

ISO New England (ISO-NE) ISO New England coordinates the six-state Northeast. Winter peaking, constrained gas supply, and limited land keep it a niche datacenter market, but proximity to Boston drives latency-sensitive demand.

How many datacenter sites are in the ISO-NE region?

GridCensus catalogs 5,817 scored datacenter candidate sites in ISO-NE, averaging 54.7/100 DC Readiness — 4% of all sites scored nationally.

What is the average interconnection-queue wait in ISO-NE?

Candidate sites in ISO-NE average a 4.3 yrs queue wait with an average queue depth of 11 projects, the 7th-shortest of 9 regions.

Which state has the most ISO-NE datacenter sites?

Massachusetts has the most, with 1,859 scored sites (32% of the region), followed by Maine with 1,183.

What is the highest-scoring datacenter site in ISO-NE?

K STREET in Suffolk County, Massachusetts scores 72.4/100, the highest DC Readiness Score in the region.

Other grid regions

Related rankings and tools

Dataset updated . Screening estimates derived from public data sources.

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “ISO-NE datacenter candidate sites”, https://gridcensus.com/iso/iso-ne (data as of November 12, 2026).

Go deeper than the public screen

Every site and score for ISO-NE is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.