At a glance
Previously developed land with real or perceived environmental contamination. Brownfields trade remediation overhead for existing utility hookups, infill locations near fiber, and redevelopment incentives.
How do brownfield sites compare with other site types?
Brownfield sites are the 8th-largest of 9 site types by count and the highest of 9 by average DC Readiness. Their 57.5 average is above the 53.0 average across all 147,272 sites. The average interconnection-queue wait in their markets, 4.5 yrs, is the 7th-shortest of 9. The brownfield category is strongest on water, averaging 75.3 against a national average of 72.3; its weakest factor is hazard resilience, at 56.3 versus 66.8 nationally.
Where are brownfield datacenter sites located?
The five states with the most are California (103, 13%), New Jersey (52, 7%), New York (48, 6%), Massachusetts (44, 6%) and Iowa (38, 5%). Brownfield sites appear in 49 states. By grid region, PJM holds 20%, MISO holds 20% and CAISO holds 12%.
Brownfield sites by state
- California103
- New Jersey52
- New York48
- Massachusetts44
- Iowa38
- Illinois33
- Texas30
- Ohio29
- Kansas23
- Michigan21
- Florida21
- Alaska20
- Pennsylvania19
- Nevada18
- Minnesota18
- South Carolina13
- Indiana13
- Connecticut13
- Wisconsin12
- North Carolina12
- Arizona12
- Virginia12
- Missouri12
- Colorado11
- New Mexico10
- Maryland10
- Louisiana10
- Nebraska9
- Tennessee9
- Washington8
- Maine8
- Vermont8
- Georgia7
- Rhode Island7
- Hawaii6
- South Dakota6
- Oregon6
- Wyoming5
- Alabama5
- Oklahoma5
- Utah4
- New Hampshire4
- Arkansas4
- North Dakota4
- Kentucky3
- Idaho2
- Delaware2
- District of Columbia1
- West Virginia1
Average sub-score profile
Top 25 brownfield datacenter sites
| Site | Type | State | County | Former use | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|---|
| UAMPS Carbon Free Power Plant | Brownfield | ID | Bonneville County | nuclear | 46 kV | 762 MW | 5.0 yrs | 72.4 |
| Aegle Power | Brownfield | TX | Cameron County | gas | 138 kV | 1,282 MW | 3.5 yrs | 71.4 |
| Charles Poletti | Brownfield | NY | New York | oil | 138 kV | 883 MW | 4.3 yrs | 71.2 |
| TXU Sweetwater Generating Plant | Brownfield | TX | Nolan County | gas | — | 344 MW | 3.5 yrs | 71.2 |
| Sediver | Brownfield | SC | York County | gas | — | 520 MW | 3.9 yrs | 70.6 |
| Manchester Landfill | Brownfield | NH | Hillsborough | landfill | — | 3 MW | 4.3 yrs | 70.2 |
| Freeport Energy | Brownfield | TX | Brazoria County | gas | 138 kV | 776 MW | 3.5 yrs | 69.9 |
| Bowline Point | Brownfield | NY | Rockland County | gas | — | 750 MW | 4.3 yrs | 69.5 |
| Copper Crossing Energy and Research Cent | Brownfield | AZ | Pinal County | gas | 69 kV | 1,779 MW | 3.5 yrs | 69.5 |
| American Bottoms Solar Project | Brownfield | MO | St. Louis | power_plant | 345 kV | 2 MW | 4.3 yrs | 69.4 |
| Music City Solar | Brownfield | TN | Davidson | landfill | — | 2 MW | 3.9 yrs | 69.3 |
| USARMY/NASA Redstone Arsenal | Brownfield | AL | Madison | superfund | — | 10 MW | 3.9 yrs | 69.2 |
| McKees Solar Park | Brownfield | DE | New Castle | landfill | — | 0 MW | 1.5 yrs | 69.2 |
| Warren AFB Wind | Brownfield | WY | Laramie | superfund | 35 kV | 3 MW | 4.3 yrs | 69.1 |
| Thornton Heights Common | Brownfield | ME | Cumberland | brownfield | — | 0 MW | 4.3 yrs | 68.7 |
| DuPont Newport | Brownfield | DE | New Castle | superfund | — | 1 MW | 1.5 yrs | 68.6 |
| Hudson County Schools of Technology (GSHP) | Brownfield | NJ | Hudson | brownfield | 345 kV | — | 2.7 yrs | 68.5 |
| F J Gannon | Brownfield | FL | Hillsborough County | coal | — | 635 MW | 3.7 yrs | 68.4 |
| Kean University (GSHP) | Brownfield | NJ | Hudson | brownfield | — | — | 2.7 yrs | 68.2 |
| Wanapum | Brownfield | WA | Grant County | hydro | 500 kV | 1,038 MW | 3.5 yrs | 68.2 |
| DFW Gas Recovery | Brownfield | TX | Denton County | gas | 14 kV | 12 MW | 3.5 yrs | 68.2 |
| Conners Creek | Brownfield | MI | Wayne County | gas | — | 275 MW | 2.2 yrs | 68.1 |
| Hazelwood Green’s Mill 19 Solar | Brownfield | PA | Allegheny | brownfield | — | 2 MW | 3.6 yrs | 68.1 |
| Chevron Casper Wind Farm | Brownfield | WY | Natrona | rcra | 115 kV | 17 MW | 3.5 yrs | 68.0 |
| Brooklyn Landfill Solar | Brownfield | OH | Cuyahoga | landfill | 345 kV | 4 MW | 5.2 yrs | 68.0 |
What do the top-scoring brownfield sites have in common?
The top 25 brownfield sites score between 68.0 and 72.4. 4 are in Texas, 2 are in New York and 2 are in Delaware. Of the top 25 brownfield sites, 12 have a recorded nearest-substation voltage, with a median of 138 kV; for 4 that substation is rated 230 kV or higher. Their counties have a median of 12 fixed fiber broadband providers in FCC data. The median distance to the nearest internet exchange facility is 6 km. The median interconnection-queue wait in their markets is 3.6 years. 1 of the 23 with a mapped FEMA flood zone sits in a high-risk (A or V) zone.
Brownfield site FAQ
What is a brownfield datacenter site?
Previously developed land with real or perceived environmental contamination. Brownfields trade remediation overhead for existing utility hookups, infill locations near fiber, and redevelopment incentives.
How many brownfield datacenter sites are there?
GridCensus catalogs 771 brownfield candidate sites nationwide, averaging 57.5/100 DC Readiness — 0.5% of all scored sites.
Which state has the most brownfield datacenter sites?
California leads with 103 brownfield candidate sites, followed by New Jersey with 52.
What is the highest-scoring brownfield datacenter site?
UAMPS Carbon Free Power Plant in Bonneville County, Idaho has the highest DC Readiness Score of any brownfield site, at 72.4/100.
How long is the interconnection queue for brownfield sites?
Brownfield candidate sites sit in markets with an average interconnection-queue wait of 4.5 yrs, the 7th-shortest of 9 site types.
Other datacenter site types
- Greenfield datacenter sites· 18,112 sites
- Industrial datacenter sites· 35,788 sites
- Substation-Adjacent datacenter sites· 38,820 sites
- Former Mine datacenter sites· 26,205 sites
- Federal Excess datacenter sites· 17,528 sites
- Manufacturing datacenter sites· 7,657 sites
- Shovel-Ready datacenter sites· 2,365 sites
- Military BRAC datacenter sites· 26 sites
By grid region
- PJM datacenter sites· 149 brownfield
- MISO datacenter sites· 148 brownfield
- CAISO datacenter sites· 88 brownfield
- ISO-NE datacenter sites· 86 brownfield
- WECC datacenter sites· 84 brownfield
- SERC datacenter sites· 70 brownfield
- SPP datacenter sites· 58 brownfield
- NYISO datacenter sites· 44 brownfield
- ERCOT datacenter sites· 18 brownfield
Dataset updated . Screening estimates derived from public data sources.
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Brownfield datacenter candidate sites”, https://gridcensus.com/site-types/brownfield (data as of November 12, 2026).
Go deeper than the public screen
Every site and score for Brownfield sites is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.