SPP Datacenter Sites

Southwest Power Pool

At a glance

SPP (Southwest Power Pool) contains 16,814 of the 147,272 datacenter candidate sites GridCensus scores — 11% of the national total and the 5th-largest of 9 grid regions by site count. Its sites average 53.2/100 on the DC Readiness Score (national average 53.0), the 6th-highest of 9 regions. Projects near these sites wait an average of 4.1 yrs in the interconnection queue.

SPP coordinates the central plains. Among the windiest grids in North America, it offers some of the lowest energy prices and shortest queues — attractive for power-hungry, latency-tolerant workloads.

16,814
Candidate sites
53.2/100
Avg DC Readiness
748.9k MW
Catalogued capacity
theoretical aggregate
4.1 yrs
Avg queue wait

How does SPP compare with other grid regions?

By site count SPP is the 5th-largest of 9 regions GridCensus tracks, with 16,814 candidate sites. Its average DC Readiness of 53.2 is the 6th-highest of 9, above the 53.0 national average. The average interconnection-queue wait of 4.1 yrs is the 4th-shortest of 9. Sites here see an average queue depth of 48 projects at their nearest point of interconnection. Catalogued substation capacity near these sites sums to 748.9k MW, a theoretical aggregate rather than available headroom.

Which states and site types make up SPP?

Oklahoma (3,704 sites, 22%), Kansas (2,350 sites, 14%) and Nebraska (2,304 sites, 14%) hold the largest shares of the region's candidate sites. By type, substation-adjacent sites make up 35% (5,866; 26% nationally), federal excess sites make up 21% (3,604; 12% nationally) and industrial sites make up 20% (3,426; 24% nationally).

What are SPP sites strongest and weakest on?

SPP is strongest on speed to power, averaging 56.1 against a national average of 50.0; its weakest factor is water, at 57.9 versus 72.3 nationally. Each factor is scored 0–100, where higher is better (for water and hazard, higher means lower stress and lower risk).

Power availability
39.0
Speed-to-power
56.1
Fiber
67.6
Water
57.9
Hazard resilience
66.8

Top 25 datacenter sites in SPP

Top datacenter sites in SPP
SiteTypeStateCountyVoltageCapacityQueue waitScore
HAWTHORNESubstation-AdjacentMOJackson County345 kV600 MW4.3 yrs70.2
FORT CALHOUNSubstation-AdjacentNEWashington County345 kV600 MW4.3 yrs69.2
Warren AFB WindBrownfieldWYLaramie35 kV3 MW4.3 yrs69.1
TONTITOWNSubstation-AdjacentARBenton County345 kV600 MW4.3 yrs68.9
UNKNOWN131651Substation-AdjacentNESarpy County345 kV600 MW4.3 yrs68.4
BROOKLINESubstation-AdjacentMOGreene County345 kV600 MW4.3 yrs68.4
ELLENDALESubstation-AdjacentNDDickey County230 kV300 MW4.3 yrs68.2
UNKNOWN131665Substation-AdjacentNESarpy County345 kV600 MW4.3 yrs68.1
UNKNOWN118392Substation-AdjacentOKMayes County345 kV600 MW4.3 yrs68.1
OPPD BLONDO STREETSubstation-AdjacentNEDouglas County345 kV600 MW4.3 yrs67.9
CRAIGSubstation-AdjacentKSJohnson County345 kV600 MW4.3 yrs67.6
UNKNOWN117601Substation-AdjacentMOCass County345 kV600 MW4.3 yrs67.4
EC Coal Sheridan CountyGreenfieldWYSheridan County——4.3 yrs67.3
OZ GreeneGreenfieldMOGreene——4.3 yrs67.2
ALKALI CREEKSubstation-AdjacentMTYellowstone County230 kV300 MW1.1 yrs67.2
UNKNOWN118616Substation-AdjacentKSJohnson County345 kV600 MW4.3 yrs67.2
UNKNOWN131937Substation-AdjacentNELancaster County345 kV600 MW4.3 yrs67.1
SHOREY ROADSubstation-AdjacentMTYellowstone County230 kV300 MW1.1 yrs67.1
UNKNOWN131751Substation-AdjacentNESarpy County345 kV600 MW4.3 yrs67.1
EC Coal Sheridan CountyGreenfieldWYSheridan County——4.3 yrs67.1
EC Near Grand AvenueGreenfieldMOJackson——4.3 yrs67.0
WICHITASubstation-AdjacentKSSedgwick County345 kV600 MW4.3 yrs67.0
TAFTSubstation-AdjacentMTShoshone County500 kV1,000 MW1.1 yrs67.0
UNKNOWN206586Substation-AdjacentWYLaramie County230 kV300 MW4.3 yrs67.0
EC Coal Pennington CountyGreenfieldSDPennington County——4.3 yrs66.9

SPP FAQ

What is SPP?

Southwest Power Pool (SPP) SPP coordinates the central plains. Among the windiest grids in North America, it offers some of the lowest energy prices and shortest queues — attractive for power-hungry, latency-tolerant workloads.

How many datacenter sites are in the SPP region?

GridCensus catalogs 16,814 scored datacenter candidate sites in SPP, averaging 53.2/100 DC Readiness — 11% of all sites scored nationally.

What is the average interconnection-queue wait in SPP?

Candidate sites in SPP average a 4.1 yrs queue wait with an average queue depth of 48 projects, the 4th-shortest of 9 regions.

Which state has the most SPP datacenter sites?

Oklahoma has the most, with 3,704 scored sites (22% of the region), followed by Kansas with 2,350.

What is the highest-scoring datacenter site in SPP?

HAWTHORNE in Jackson County, Missouri scores 70.2/100, the highest DC Readiness Score in the region.

Other grid regions

Related rankings and tools

Dataset updated . Screening estimates derived from public data sources.

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “SPP datacenter candidate sites”, https://gridcensus.com/iso/spp (data as of November 12, 2026).

Go deeper than the public screen

Every site and score for SPP is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.