WECC Datacenter Sites

Western Electricity Coordinating Council

WECC spans the entire western interconnection outside California's ISO, from the Rockies to the Pacific Northwest. Abundant hydro and renewables pair with rapidly growing load and long transmission distances.

26,525
Candidate sites
52.6/100
Avg DC Readiness
3.3M MW
Catalogued capacity
theoretical aggregate
2.8 yrs
Avg queue wait

Average sub-score profile

Power availability
39.8
Speed-to-power
28.2
Fiber
65.5
Water
46.8
Hazard resilience
76.1

Top 25 datacenter sites in WECC

Top datacenter sites in WECC
SiteTypeStateCountyVoltageCapacityQueue waitScore
UAMPS Carbon Free Power PlantBrownfieldIDBonneville County46 kV762 MW2.0 yrs73.2
KEELERSubstation-AdjacentORWashington County500 kV1,000 MW6.9 yrs71.3
PEARLSubstation-AdjacentORWashington County500 kV1,000 MW6.9 yrs70.0
BPA TROUTDALESubstation-AdjacentORMultnomah County500 kV1,000 MW6.9 yrs69.8
Warren AFB WindBrownfieldWYLaramie35 kV3 MW6.9 yrs69.4
Chevron Casper Wind FarmBrownfieldWYNatrona115 kV17 MW6.9 yrs69.2
OSTRANDERSubstation-AdjacentORMultnomah County500 kV1,000 MW6.9 yrs68.6
COLUMBIASubstation-AdjacentWAGrant County500 kV1,000 MW6.9 yrs68.1
EC Coal Sheridan CountyGreenfieldWYSheridan County1.7 yrs68.0
MAPLE VALLEYSubstation-AdjacentWAKing County500 kV1,000 MW6.9 yrs67.8
ALVEYSubstation-AdjacentORLane County500 kV1,000 MW6.9 yrs67.8
EC Coal Sheridan CountyGreenfieldWYSheridan County1.7 yrs67.8
Copper Crossing Energy and Research CentBrownfieldAZPinal County69 kV1,779 MW5.7 yrs67.6
EC Near eBay - South JordanGreenfieldUTSalt Lake1.7 yrs67.5
SNO-KINGSubstation-AdjacentWAKitsap County500 kV1,000 MW6.9 yrs67.5
LANESubstation-AdjacentORLane County500 kV1,000 MW6.9 yrs67.3
CHEROKEESubstation-AdjacentCODenver County230 kV300 MW6.9 yrs67.3
MERIDIANSubstation-AdjacentORJackson County500 kV1,000 MW6.9 yrs67.2
OZ SpokaneGreenfieldWASpokane1.7 yrs67.1
COVINGTONSubstation-AdjacentWAKing County500 kV1,000 MW6.9 yrs67.1
UNKNOWN206104Substation-AdjacentWAGrant County230 kV300 MW6.9 yrs67.1
OZ Salt LakeGreenfieldUTSalt Lake1.7 yrs67.0
UNKNOWN206586Substation-AdjacentWYLaramie County230 kV300 MW6.9 yrs67.0
TAP200917Substation-AdjacentWASnohomish County500 kV1,000 MW6.9 yrs67.0
HORIZONSubstation-AdjacentORWashington County230 kV300 MW6.9 yrs66.9

WECC FAQ

What is WECC?
Western Electricity Coordinating Council (WECC) WECC spans the entire western interconnection outside California's ISO, from the Rockies to the Pacific Northwest. Abundant hydro and renewables pair with rapidly growing load and long transmission distances.
How many datacenter sites are in the WECC region?
GridCensus catalogs 26,525 scored datacenter candidate sites in WECC, averaging 52.6/100 DC Readiness.
What is the average interconnection-queue wait in WECC?
Candidate sites in WECC average a 2.8 yrs queue wait with an average queue depth of 73 projects.

Dataset updated . Screening estimates derived from public data sources.