WECC Datacenter Sites
Western Electricity Coordinating Council
At a glance
WECC spans the entire western interconnection outside California's ISO, from the Rockies to the Pacific Northwest. Abundant hydro and renewables pair with rapidly growing load and long transmission distances.
How does WECC compare with other grid regions?
By site count WECC is the 3rd-largest of 9 regions GridCensus tracks, with 24,461 candidate sites. Its average DC Readiness of 50.8 is the 8th-highest of 9, below the 53.0 national average. The average interconnection-queue wait of 3.7 yrs is the 2nd-shortest of 9. Sites here see an average queue depth of 66 projects at their nearest point of interconnection. Catalogued substation capacity near these sites sums to 903.1k MW, a theoretical aggregate rather than available headroom.
Which states and site types make up WECC?
Washington (6,017 sites, 25%), Arizona (3,804 sites, 16%) and Oregon (2,430 sites, 10%) hold the largest shares of the region's candidate sites. By type, federal excess sites make up 40% (9,756; 12% nationally), substation-adjacent sites make up 25% (6,054; 26% nationally) and industrial sites make up 18% (4,458; 24% nationally).
Member states
- Washington6,017
- Arizona3,804
- Oregon2,430
- Utah2,193
- Idaho2,164
- Montana1,963
- Colorado1,389
- California1,324
- New Mexico1,103
- Nevada1,070
- Wyoming669
- Texas329
- Nebraska5
- North Dakota1
By site type
- Federal Excess9,756
- Substation-Adjacent6,054
- Industrial4,458
- Former Mine2,757
- Greenfield1,348
- Brownfield84
- Military BRAC4
What are WECC sites strongest and weakest on?
WECC is strongest on hazard resilience, averaging 76.8 against a national average of 66.8; its weakest factor is water, at 42.0 versus 72.3 nationally. Each factor is scored 0–100, where higher is better (for water and hazard, higher means lower stress and lower risk).
Top 25 datacenter sites in WECC
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| COLSTRIP | Substation-Adjacent | MT | Rosebud County | 500 kV | 1,000 MW | 1.1 yrs | 75.8 |
| UAMPS Carbon Free Power Plant | Brownfield | ID | Bonneville County | 46 kV | 762 MW | 5.0 yrs | 72.4 |
| KEELER | Substation-Adjacent | OR | Washington County | 500 kV | 1,000 MW | 3.5 yrs | 70.9 |
| PEARL | Substation-Adjacent | OR | Washington County | 500 kV | 1,000 MW | 3.5 yrs | 70.3 |
| BROADVIEW | Substation-Adjacent | MT | Golden Valley County | 500 kV | 1,000 MW | 1.1 yrs | 70.1 |
| BPA TROUTDALE | Substation-Adjacent | OR | Multnomah County | 500 kV | 1,000 MW | 3.5 yrs | 69.7 |
| Copper Crossing Energy and Research Cent | Brownfield | AZ | Pinal County | 69 kV | 1,779 MW | 3.5 yrs | 69.5 |
| COLUMBIA | Substation-Adjacent | WA | Grant County | 500 kV | 1,000 MW | 3.5 yrs | 69.1 |
| OSTRANDER | Substation-Adjacent | OR | Multnomah County | 500 kV | 1,000 MW | 3.5 yrs | 68.7 |
| ALVEY | Substation-Adjacent | OR | Lane County | 500 kV | 1,000 MW | 3.5 yrs | 68.5 |
| MAPLE VALLEY | Substation-Adjacent | WA | King County | 500 kV | 1,000 MW | 3.5 yrs | 68.4 |
| Wanapum | Brownfield | WA | Grant County | 500 kV | 1,038 MW | 3.5 yrs | 68.2 |
| COVINGTON | Substation-Adjacent | WA | King County | 500 kV | 1,000 MW | 3.5 yrs | 68.2 |
| SNO-KING | Substation-Adjacent | WA | Kitsap County | 500 kV | 1,000 MW | 3.5 yrs | 68.2 |
| TAP200917 | Substation-Adjacent | WA | Snohomish County | 500 kV | 1,000 MW | 3.5 yrs | 68.1 |
| LANE | Substation-Adjacent | OR | Lane County | 500 kV | 1,000 MW | 3.5 yrs | 68.1 |
| Chevron Casper Wind Farm | Brownfield | WY | Natrona | 115 kV | 17 MW | 3.5 yrs | 68.0 |
| BELL | Substation-Adjacent | WA | Spokane County | 500 kV | 1,000 MW | 3.5 yrs | 68.0 |
| CHEROKEE | Substation-Adjacent | CO | Denver County | 230 kV | 300 MW | 3.5 yrs | 67.9 |
| MONROE | Substation-Adjacent | WA | Snohomish County | 500 kV | 1,000 MW | 3.5 yrs | 67.8 |
| UNKNOWN201455 | Substation-Adjacent | WA | Thurston County | 500 kV | 1,000 MW | 3.5 yrs | 67.8 |
| MCNARY | Substation-Adjacent | OR | Benton County | 500 kV | 1,000 MW | 3.5 yrs | 67.6 |
| MERIDIAN | Substation-Adjacent | OR | Jackson County | 500 kV | 1,000 MW | 3.5 yrs | 67.6 |
| RATTLESNAKE | Substation-Adjacent | MT | Missoula County | 230 kV | 300 MW | 1.1 yrs | 67.4 |
| SACAJAWEA | Substation-Adjacent | WA | Walla Walla County | 500 kV | 1,000 MW | 3.5 yrs | 67.4 |
WECC FAQ
What is WECC?
Western Electricity Coordinating Council (WECC) WECC spans the entire western interconnection outside California's ISO, from the Rockies to the Pacific Northwest. Abundant hydro and renewables pair with rapidly growing load and long transmission distances.
How many datacenter sites are in the WECC region?
GridCensus catalogs 24,461 scored datacenter candidate sites in WECC, averaging 50.8/100 DC Readiness — 17% of all sites scored nationally.
What is the average interconnection-queue wait in WECC?
Candidate sites in WECC average a 3.7 yrs queue wait with an average queue depth of 66 projects, the 2nd-shortest of 9 regions.
Which state has the most WECC datacenter sites?
Washington has the most, with 6,017 scored sites (25% of the region), followed by Arizona with 3,804.
What is the highest-scoring datacenter site in WECC?
COLSTRIP in Rosebud County, Montana scores 75.8/100, the highest DC Readiness Score in the region.
Other grid regions
Related rankings and tools
Dataset updated . Screening estimates derived from public data sources.
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “WECC datacenter candidate sites”, https://gridcensus.com/iso/wecc (data as of November 12, 2026).
Go deeper than the public screen
Every site and score for WECC is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.