Warren AFB Wind

Brownfield

Laramie County, Wyoming · WECC

DC Readiness
69.0
Good / 100

Warren AFB Wind is a brownfield datacenter candidate site in Laramie County, Wyoming, interconnecting through WECC. It screens at 69.0/100 DC Readiness with a catalogued 3 MW of candidate capacity.

Power & interconnection

Substation distance1.3 mi
Available capacity3 MW
Utility commercial rate0.07¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74

Connectivity

Nearest IXPCogent Cheyenne
IXP distance0.7 mi
Fiber providers10
Nearest cloud providerAzure
Nearest cloud regionwestcentralus
Cloud region distance1.4 mi

Site characteristics

Site typeBrownfield
Acreage3,851 ac
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity
Former usesuperfund
Existing capacity3 MW
Cleanup statuscleanup_complete

Risk & environment

Flood zoneZone X
Water stress (WRI)2.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteSCHROLL CABINETS
Hazard sub-score80/100
Construction cost index86.9 (avg 100)

Location context

Nearest datacenterCogent Cheyenne
DC distance0.7 mi
Nearest rail0.3 mi
Nearest gas pipeline8.4 mi
County hazard (FEMA NRI)Very Low (10)
DC tax incentiveYes (no_income_tax)
Commercial electricity6.50¢/kWh
Industrial electricity9.76¢/kWh
Cooling degree days300
Heating degree days7,600
Land price / acre$2,003

Incentive detail: No state corporate or personal income tax; low property taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
43
Speed to power15%
31
Fiber connectivity12%
99
Energy cost10%
95
Water risk8%
64
Natural hazard8%
80
Buildability7%
95
Labor market4%
50
DC cluster4%
100
Land / acreage3%
84
Construction cost3%
78
Gas pipeline2%
73
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Laramie County, ranked by DC Readiness.

Sites near Warren AFB Wind
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN206586Substation-Adjacent230 kV300 MW1.7 yrs76.0
UNKNOWN205186Substation-Adjacent230 kV300 MW1.7 yrs72.2
UNKNOWN202330Substation-Adjacent138 kV100 MW1.7 yrs71.6
UNKNOWN203998Substation-Adjacent230 kV300 MW1.7 yrs71.2
UNKNOWN202329Substation-Adjacent115 kV100 MW1.7 yrs70.8
UNKNOWN204232Substation-Adjacent230 kV300 MW1.7 yrs70.7
UNKNOWN202336Substation-Adjacent161 kV100 MW1.7 yrs70.2
UNKNOWN202331Substation-Adjacent138 kV100 MW1.7 yrs69.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Warren AFB Wind, Laramie County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.