Skip to content
Gridcensus

Capitol County, Connecticut · ISO-NE

DC Readiness
68.0
Good / 100

TAP136499 is a substation-adjacent datacenter candidate site in Capitol County, Connecticut, interconnecting through ISO-NE. It screens at 68.0/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP136499
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionISO-NE
Queue depth34
Avg queue wait3.9 yrs

Connectivity

Nearest IXPCrown Castle Hartford (960 Main)
IXP distance5.7 mi

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score80/100

Location context

Nearest datacenterCrown Castle Hartford (960 Main)
DC distance5.7 mi
County hazard (FEMA NRI)Relatively Low (20)
DC tax incentiveYes (sales_tax_exemption)
Cooling degree days700
Heating degree days5,800
Land price / acre$14,669

Incentive detail: Sales tax exemption on computer & data processing equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
37
Fiber connectivity12%
90
Energy cost10%
50
Water risk8%
88
Natural hazard8%
80
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Capitol County, ranked by DC Readiness.

Sites near TAP136499
SiteTypeVoltageCapacityQueue waitScore
MANCHESTERSubstation-Adjacent345 kV600 MW3.9 yrs68.0
NORTH BLOOMFIELDSubstation-Adjacent345 kV600 MW3.9 yrs67.2
BARBOUR HILLSubstation-Adjacent345 kV600 MW3.9 yrs67.2
RIVERSIDE DRSubstation-Adjacent115 kV100 MW3.9 yrs63.6
TAP136500Substation-Adjacent115 kV100 MW3.9 yrs63.6
UNKNOWN136498Substation-Adjacent115 kV100 MW3.9 yrs63.4
SOUTHWEST HARTFORDSubstation-Adjacent115 kV100 MW3.9 yrs63.3
EAST HARTFORDSubstation-Adjacent115 kV100 MW3.9 yrs63.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP136499, Capitol County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.