Skip to content
Gridcensus

Greenfield Datacenter Sites in North Carolina

North Carolina has 518 greenfield datacenter candidate sites. Undeveloped land with no prior industrial use. Greenfield parcels offer maximum design flexibility and large contiguous footprints, but typically require full utility build-out — the speed-to-power story hinges on proximity to existing transmission.

518
Greenfield sites
61.7/100
Avg score (top 25)
North Carolina
State
Greenfield
Type

Top greenfield sites in North Carolina

Top Greenfield sites in North Carolina
SiteTypeCountyVoltageCapacityQueue waitScore
OZ DurhamGreenfieldDurham——4.3 yrs63.5
OZ WakeGreenfieldWake——4.3 yrs63.4
EC Near Mas Durham Power, LLCGreenfieldDurham——4.3 yrs62.8
EC Near Mas Durham Power, LLCGreenfieldDurham——4.3 yrs62.7
EC Near Mas Durham Power, LLCGreenfieldDurham——4.3 yrs62.5
OZ WakeGreenfieldWake——4.3 yrs62.3
OZ WakeGreenfieldWake——4.3 yrs62.2
OZ WakeGreenfieldWake——4.3 yrs62.1
EC Coal Buncombe CountyGreenfieldBuncombe County——4.3 yrs62.0
EC Coal Wake CountyGreenfieldWake County——4.3 yrs62.0
OZ MecklenburgGreenfieldMecklenburg——4.3 yrs61.8
OZ CabarrusGreenfieldCabarrus——4.3 yrs61.8
EC Coal Buncombe CountyGreenfieldBuncombe County——4.3 yrs61.8
OZ BuncombeGreenfieldBuncombe——4.3 yrs61.7
EC Near Univ of NC Chapel Hill Cogen FacilityGreenfieldOrange——4.3 yrs61.7
EC Coal Wake CountyGreenfieldWake County——4.3 yrs61.5
Greenfield (CRANBERRY - CABOT)GreenfieldButler County500 kV1,000 MW3.8 yrs61.4
EC Coal Wake CountyGreenfieldWake County——4.3 yrs61.2
OZ MecklenburgGreenfieldMecklenburg——4.3 yrs61.1
Greenfield (MAYO - DURHAM)GreenfieldDurham County500 kV1,000 MW3.8 yrs60.9
OZ DurhamGreenfieldDurham——4.3 yrs60.9
OZ MecklenburgGreenfieldMecklenburg——4.3 yrs60.9
OZ RowanGreenfieldRowan——4.3 yrs60.5
EC Coal Mecklenburg CountyGreenfieldMecklenburg County——4.3 yrs60.2
EC Near RiverbendGreenfieldGaston——4.3 yrs60.0
How many greenfield datacenter sites are in North Carolina?
GridCensus catalogs 518 greenfield datacenter candidate sites in North Carolina.
What is a greenfield datacenter site?
Undeveloped land with no prior industrial use. Greenfield parcels offer maximum design flexibility and large contiguous footprints, but typically require full utility build-out — the speed-to-power story hinges on proximity to existing transmission.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield sites in North Carolina. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.