EC Coal Mecklenburg County

Greenfield

Mecklenburg County, North Carolina · PJM

DC Readiness
60.3
Good / 100

EC Coal Mecklenburg County is a greenfield datacenter candidate site in Mecklenburg County, North Carolina, interconnecting through PJM. It screens at 60.3/100 DC Readiness and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth177
Avg queue wait4.3 yrs
Recent queue wait4.3 yrs
Completion rate14%
Withdrawal rate86%

Connectivity

Nearest IXPCLT2
IXP distance4.1 mi
Fiber providers23
Fiber coverage83.4%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance151.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerTimothy M Manigault
Parcel APN11304635
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former usecoal adjacent

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund sitePORTERS FAB INC
Hazard sub-score48/100
Construction cost index108.7 (avg 100)

Location context

Nearest datacenterCLT2
DC distance4.1 mi
Nearest rail0.3 mi
Nearest gas pipeline11.0 mi
Nearest fiber route106.7 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.03¢/kWh
Industrial electricity7.24¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$27,096

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
35
Fiber connectivity12%
95
Energy cost10%
82
Water risk8%
87
Natural hazard8%
48
Buildability7%
92
Labor market4%
50
DC cluster4%
85
Land / acreage3%
30
Construction cost3%
59
Gas pipeline2%
65
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Mecklenburg County, ranked by DC Readiness.

Sites near EC Coal Mecklenburg County
SiteTypeVoltageCapacityQueue waitScore
MCGUIRESubstation-Adjacent500 kV1,000 MW3.7 yrs81.1
UNKNOWN114646Substation-Adjacent230 kV300 MW4.3 yrs72.4
WOODLAWNSubstation-Adjacent230 kV300 MW4.3 yrs72.3
TAP169820Substation-Adjacent230 kV300 MW4.3 yrs71.4
UNKNOWN114635Substation-Adjacent230 kV300 MW4.3 yrs71.3
UNKNOWN114253Substation-Adjacent230 kV300 MW4.3 yrs70.6
RIVERBENDSubstation-Adjacent230 kV300 MW4.3 yrs70.4
UNKNOWN110993Substation-Adjacent230 kV300 MW4.3 yrs70.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Coal Mecklenburg County, Mecklenburg County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.