DC Readiness
54.6
Fair / 100

At a glance

EC Near Greenland Energy Center is a greenfield datacenter candidate site in Duval, Florida, scoring 54.6/100 DC Readiness — 220th of 263 scored sites in the county. It sits in the SERC grid region and the FLORIDA POWER & LIGHT CO service territory, where interconnection has averaged 3.7 years from request to operation.

Power & interconnection

Utility commercial rate0.11¢/kWh
UtilityFLORIDA POWER & LIGHT COinvestor ownedfavorable to large load · terms ≥ 50 MWLarge Load Contract Service (LLCS, ≥50 MW) · 90% min take · 20 yr

Speed to power

Interconnection outlookModerate
≈ 4.6 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait4.6 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPTierPoint Jacksonville
IXP distance10.7 mi
Fiber providers16
Fiber coverage72.0%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance225.4 mi

Site characteristics

Site typeGreenfield
Parcel ownerEstuary LLC
Land contactDuval County Assessor
Land owner typeprivate
Buildability20.0/100
Land cover (NLCD)Emergent Herbaceous Wetlands
Former usenear retired gas plant (10km)

Risk & environment

Environmental constraintLow (15/100)
Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score35/100
Construction cost index86.5 (avg 100)

Location context

Nearest datacenterTierPoint Jacksonville
DC distance10.7 mi
Nearest rail5.4 mi
Nearest gas pipeline17.6 mi
Nearest fiber route122.8 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.97¢/kWh
Industrial electricity7.84¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$13,486

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Greenland Energy Center

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Near Greenland Energy Center compare with other sites in Duval?

EC Near Greenland Energy Center ranks 220th of 263 scored candidate sites in Duval. Its 54.6/100 is roughly in line with the county average of 58.3. It is roughly in line with the Florida average of 56.0 and roughly in line with the national average of 53.2.

Against the Florida average, its strongest sub-score is water (81 vs 76) and its weakest is fiber connectivity (57 vs 73). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Near Greenland Energy Center to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is TierPoint Jacksonville at 10.7 miles. 16 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is TierPoint Jacksonville, 10.7 miles away.

What are the flood, water and hazard risks at EC Near Greenland Energy Center?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 1.20 on a 0–5 scale. Mapped wetlands (National Wetlands Inventory) are present on the parcel. At the county level, FEMA's National Risk Index rates Duval "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
65
Fiber connectivity12%
57
Energy cost10%
89
Water risk7%
81
Natural hazard6%
35
Buildability7%
20
Labor market4%
50
DC cluster4%
80
Land / acreage3%
40
Construction cost3%
78
Gas pipeline2%
43
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Duval, ranked by DC Readiness.

Sites near EC Near Greenland Energy Center
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN120509Substation-Adjacent230 kV300 MW3.7 yrs68.3
DUVALSubstation-Adjacent500 kV1,000 MW3.7 yrs68.2
Southside Generating StationBrownfield—232 MW3.7 yrs67.9
HARTLEYSubstation-Adjacent230 kV300 MW3.7 yrs66.8
FORESTSubstation-Adjacent230 kV300 MW3.7 yrs66.6
GREEN ENERGY CENTERSubstation-Adjacent230 kV300 MW3.7 yrs66.4
EC Near J D KennedyGreenfield——3.7 yrs66.0
UNKNOWN120521Substation-Adjacent230 kV300 MW3.7 yrs65.9

EC Near Greenland Energy Center: common questions

What is the DC Readiness score of EC Near Greenland Energy Center?

EC Near Greenland Energy Center scores 54.6/100 on the GridCensus DC Readiness scale, rated fair. It ranks 220th of 263 scored sites in Duval. The Duval average is 58.3 and the Florida average is 56.0.

Which electric utility serves EC Near Greenland Energy Center?

FLORIDA POWER & LIGHT CO (investor owned) holds the retail service territory that contains the site; its holding company is NEXTERA ENERGY INC.

What grid region is EC Near Greenland Energy Center in?

EC Near Greenland Energy Center is in the SERC region. Projects interconnecting there have averaged a 3.7-year wait from queue request to operation.

Is EC Near Greenland Energy Center in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

Who owns EC Near Greenland Energy Center?

Parcel records list the owner as Estuary LLC (private land).

How far is EC Near Greenland Energy Center from an internet exchange?

The nearest internet exchange facility is TierPoint Jacksonville, about 10.7 miles away; 16 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Near Greenland Energy Center, Duval, FL”, https://gridcensus.com/datacenter-sites/florida/duval/ec-near-greenland-energy-center-a9dd7fc9 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near Greenland Energy Center, Duval is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.