EC Coal Duval County

Greenfield

Duval, Florida · SERC

DC Readiness
62.2
Good / 100

EC Coal Duval County is a greenfield datacenter candidate site in Duval, Florida, interconnecting through SERC. It screens at 62.2/100 DC Readiness and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPSBA Edge - Jacksonville (JAX)
IXP distance5.0 mi
Fiber providers18
Fiber coverage72.7%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance215.5 mi

Site characteristics

Site typeGreenfield
Parcel ownerMendoza Daniel Et Al
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former usecoal adjacent

Risk & environment

Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund sitePRIME TIME FOOD STORE
Hazard sub-score35/100
Construction cost index93.5 (avg 100)

Location context

Nearest datacenterCologix Jacksonville JAX1
DC distance5.0 mi
Nearest rail1.4 mi
Nearest gas pipeline6.6 mi
Nearest fiber route109.7 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.97¢/kWh
Industrial electricity7.84¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$13,486

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
75
Fiber connectivity12%
74
Energy cost10%
89
Water risk8%
76
Natural hazard8%
35
Buildability7%
92
Labor market4%
50
DC cluster4%
80
Land / acreage3%
33
Construction cost3%
72
Gas pipeline2%
79
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Duval, ranked by DC Readiness.

Sites near EC Coal Duval County
SiteTypeVoltageCapacityQueue waitScore
BARTRAMSubstation-Adjacent230 kV300 MW3.6 yrs75.6
UNKNOWN120521Substation-Adjacent230 kV300 MW3.6 yrs75.0
UNKNOWN120554Substation-Adjacent230 kV300 MW5.8 yrs74.1
UNKNOWN120519Substation-Adjacent230 kV300 MW3.6 yrs74.1
FORT CAROLINESubstation-Adjacent230 kV300 MW5.8 yrs73.5
BLOUNT ISLANDSubstation-Adjacent230 kV300 MW5.8 yrs73.2
TAP161532Substation-Adjacent230 kV300 MW3.6 yrs73.2
TAP151528Substation-Adjacent230 kV300 MW3.6 yrs72.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen