Legacy capacity
881
MW

C D McIntosh Jr is a coal plant in Lakeland, Polk, Florida, retired 2021-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 881 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity881 MW
Retirement date2021-04-01
EIA plant ID#676

Grid hookup & remediation

Nearest substation0.1 mi
Operator address3030 E. Lake Parker Dr, Lakeland, FL, 33801
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near C D McIntosh Jr, ranked by DC Readiness.

Candidate sites near C D McIntosh Jr
SiteTypeStateCountyVoltageCapacityQueue waitScore
KATHLEENSubstation-AdjacentFLPolk County500 kV1,000 MW1.0 yrs68.5
UNKNOWN120314Substation-AdjacentFLPolk County230 kV300 MW1.0 yrs67.3
UNKNOWN120320Substation-AdjacentFLPolk County230 kV300 MW1.0 yrs67.1
OZ PolkGreenfieldFLPolk3.6 yrs67.0
THONOTOSASSASubstation-AdjacentFLHillsborough County230 kV300 MW1.0 yrs66.8
SOUTH ELOISESubstation-AdjacentFLPolk County230 kV300 MW1.0 yrs66.6
RIVERVIEWSubstation-AdjacentFLHillsborough County230 kV300 MW1.0 yrs66.3
EC Near Larsen MemorialGreenfieldFLPolk3.6 yrs66.3

Nearby internet exchanges

See all datacenter sites in Florida

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for C D McIntosh Jr, Lakeland, Polk, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.