P L Bartow

Brownfield

St. Petersburg, Pinellas, Florida · Duke Energy Florida, LLC

Legacy capacity
494
MW

P L Bartow is a oil plant in St. Petersburg, Pinellas, Florida, retired 2009-06-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 494 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity494 MW
Retirement date2009-06-01
EIA plant ID#634

Grid hookup & remediation

Nearest substation0.0 mi
OperatorDuke Energy Florida, LLC
Operator address1601 Weedon Island Drive, St. Petersburg, FL, 33702
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near P L Bartow, ranked by DC Readiness.

Candidate sites near P L Bartow
SiteTypeStateCountyVoltageCapacityQueue waitScore
LAKE TARPONSubstation-AdjacentFLPasco County500 kV1,000 MW3.6 yrs79.2
DEADEND167089Substation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs76.6
JUNEAUSubstation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs76.4
UNKNOWN120308Substation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.9
ANCLOTESubstation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.9
UNKNOWN120342Substation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.3
TAP151120Substation-AdjacentFLHillsborough County138 kV100 MW3.6 yrs73.1
DALE MABRYSubstation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs73.0

Nearby internet exchanges

See all datacenter sites in Florida

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for P L Bartow, St. Petersburg, Pinellas, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.