Legacy capacity
233
MW

Hookers Point is a oil plant in Tampa, Hillsborough, Florida, retired 2003-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 233 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity233 MW
Retirement date2003-01-01
EIA plant ID#647

Grid hookup & remediation

Nearest substation2.5 mi
OperatorTampa Electric Co
Operator addressFoot of - Hemlock Street, Tampa, FL, 33619
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Hookers Point, ranked by DC Readiness.

Candidate sites near Hookers Point
SiteTypeStateCountyVoltageCapacityQueue waitScore
LAKE TARPONSubstation-AdjacentFLPasco County500 kV1,000 MW3.6 yrs79.2
DEADEND167089Substation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs76.6
JUNEAUSubstation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs76.4
TAP142090Substation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs74.8
UNKNOWN120308Substation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.9
ANCLOTESubstation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.9
UNKNOWN120342Substation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.3
TAP151120Substation-AdjacentFLHillsborough County138 kV100 MW3.6 yrs73.1

Nearby internet exchanges

See all datacenter sites in Florida

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.