Cocoa, Brevard, Florida · NextEra Renewable Fuels, LLC

Legacy capacity
3
MW

Brevard is a natural gas plant in Cocoa, Brevard, Florida, retired 2020-05-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity3 MW
Retirement date2020-05-01
EIA plant ID#61777

Grid hookup & remediation

Nearest substation2.6 mi
Operator address2250 Adamson Road, Cocoa, FL, 32926
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Brevard County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)210,348
IT / tech employment160
Construction employment17,891
Land value$7,712/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate11.02¢/kWh
Industrial power rate8.73¢/kWh
Load growth (FERC-714)1.8%

Water & cooling

Water stressLow-Medium
Public water supply31.4 MGD
Industrial water use6.3 MGD
Cooling degree days3,500
Mean annual temp72°F

Hazard, flood & connectivity

FEMA risk index55.0 · Very High
Fiber providers9 · 58% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Brevard — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Cape Canaveraloil plant8046.6 mi—
Curtis H Stanton Energy Centercoal plant32921.6 mi—
Seminole Energynatural gas plant231.7 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Brevard

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Brevard, ranked by DC Readiness.

Candidate sites near Brevard
SiteTypeStateCountyVoltageCapacityQueue waitScore
POINSETTSubstation-AdjacentFLBrevard County500 kV1,000 MW1.0 yrs68.8
CAPE CANAVERALSubstation-AdjacentFLBrevard County230 kV300 MW1.0 yrs68.1
STANTONSubstation-AdjacentFLOrange County230 kV300 MW1.0 yrs67.4
VIERASubstation-AdjacentFLBrevard County230 kV300 MW1.0 yrs66.8
MAGNOLIA RANCH NORTHSubstation-AdjacentFLOrange County230 kV300 MW1.0 yrs66.6
UNKNOWN120271Substation-AdjacentFLSeminole County230 kV300 MW1.0 yrs66.5
SARNOSubstation-AdjacentFLBrevard County230 kV300 MW1.0 yrs66.3
UNKNOWN120180Substation-AdjacentFLBrevard County230 kV300 MW1.0 yrs66.3

Nearby internet exchanges

See all datacenter sites in Florida →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.