Crystal River

Brownfield

Crystal River, Citrus, Florida · Duke Energy Florida, LLC

Legacy capacity
1,855
MW

Crystal River is a coal plant in Crystal River, Citrus, Florida, retired 2018-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1,855 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity1,855 MW
Retirement date2018-12-01
EIA plant ID#628

Grid hookup & remediation

Nearest substation3.8 mi
OperatorDuke Energy Florida, LLC
Operator address15760 West Powerline Street, Crystal River, FL, 34428
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Crystal River, ranked by DC Readiness.

Candidate sites near Crystal River
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROOKRIDGESubstation-AdjacentFLHernando County500 kV1,000 MW3.6 yrs75.5
CRYSTAL RIVERSubstation-AdjacentFLCitrus County500 kV1,000 MW3.6 yrs68.3
Greenfield (CRYSTAL RIVER - CENTRAL FLORID)GreenfieldFLCitrus County500 kV1,000 MW3.6 yrs67.6
TAP155704Substation-AdjacentFLCitrus County230 kV300 MW3.6 yrs67.2
TWIN COUNTY RANCHSubstation-AdjacentFLHernando County115 kV100 MW3.6 yrs67.0
CRYSTAL RIVER EASTSubstation-AdjacentFLCitrus County230 kV300 MW3.6 yrs66.9
Greenfield (BROOKRIDGE - CRYSTAL RIVER)GreenfieldFLHernando County500 kV1,000 MW3.6 yrs66.0
Greenfield (BROOKRIDGE - UNKNOWN156846)GreenfieldFLHernando County230 kV300 MW3.6 yrs64.9

See all datacenter sites in Florida

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.