Levy Nuclear Plant
BrownfieldInglis, Levy, Florida · Duke Energy Florida, LLC
Levy Nuclear Plant is a nuclear plant in Inglis, Levy, Florida. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2,500 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Levy County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Levy Nuclear Plant — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Crystal River | coal plant | 1,855 | 8.7 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Levy Nuclear Plant
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Levy Nuclear Plant, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CRYSTAL RIVER | Substation-Adjacent | FL | Citrus County | 500 kV | 1,000 MW | 1.0 yrs | 67.4 |
| BRONSON | Substation-Adjacent | FL | Levy County | 230 kV | 300 MW | 1.0 yrs | 63.4 |
| OZ Marion | Greenfield | FL | Marion | — | — | 3.6 yrs | 61.8 |
| TAP155704 | Substation-Adjacent | FL | Citrus County | 230 kV | 300 MW | 1.0 yrs | 61.8 |
| ROSS PRAIRIE | Substation-Adjacent | FL | Marion County | 230 kV | 300 MW | 1.0 yrs | 61.6 |
| HOLDER | Substation-Adjacent | FL | Citrus County | 230 kV | 300 MW | 1.0 yrs | 61.4 |
| EC Coal Citrus County | Greenfield | FL | Citrus County | — | — | 3.6 yrs | 61.4 |
| UNKNOWN156846 | Substation-Adjacent | FL | Citrus County | 230 kV | 300 MW | 1.0 yrs | 61.3 |
See all datacenter sites in Florida →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Levy Nuclear Plant, Inglis, Levy, Florida. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.