Cutrale Citrus Juices USA I
BrownfieldLeesburg, Lake, Florida · Cutrale Citrus Juices USA Inc
Cutrale Citrus Juices USA I is a natural gas plant in Leesburg, Lake, Florida, retired 2016-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 8 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Cutrale Citrus Juices USA I, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| INTERNATIONAL DRIVE | Substation-Adjacent | FL | Orange County | 230 kV | 300 MW | 3.6 yrs | 74.8 |
| UNKNOWN120219 | Substation-Adjacent | FL | Lake County | 230 kV | 300 MW | 3.6 yrs | 73.5 |
| PIEDMONT | Substation-Adjacent | FL | Orange County | 230 kV | 300 MW | 3.6 yrs | 73.4 |
| UNKNOWN120511 | Substation-Adjacent | FL | Lake County | 230 kV | 300 MW | 3.6 yrs | 72.7 |
| CENTRAL FLORIDA | Substation-Adjacent | FL | Sumter County | 500 kV | 1,000 MW | 3.6 yrs | 71.8 |
| HAINES | Substation-Adjacent | FL | Lake County | 230 kV | 300 MW | 3.6 yrs | 71.2 |
| AVALON | Substation-Adjacent | FL | Lake County | 230 kV | 300 MW | 3.6 yrs | 70.9 |
| UNKNOWN108236 | Substation-Adjacent | FL | Marion County | 230 kV | 300 MW | 3.6 yrs | 70.5 |
Nearby internet exchanges
- CoreSite - Orlando (OR1)Orlando, FL · 12 networks
- Colo Solutions Downtown OrlandoOrlando, FL · 10 networks
- HostDime Orlando Data CenterOrlando, FL · 9 networks
- HostDime Orlando Tier IV Data CenterOrlando, FL · 2 networks
See all datacenter sites in Florida →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.