CLERMONT EAST is a substation-adjacent datacenter candidate site in Lake County, Florida, interconnecting through SERC. It screens at 64.6/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCLERMONT EAST
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPCoreSite - Orlando (OR1)
IXP distance19.6 mi
Fiber providers11
Fiber coverage50.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterE-Foam
DC distance9.2 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.28¢/kWh
Industrial electricity9.27¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$11,976

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track CLERMONT EAST

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
73
Fiber connectivity12%
68
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Lake County, ranked by DC Readiness.

Sites near CLERMONT EAST
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN120219Substation-Adjacent230 kV300 MW1.0 yrs66.3
UNKNOWN120511Substation-Adjacent230 kV300 MW1.0 yrs64.6
CAMP LAKESubstation-Adjacent230 kV300 MW1.0 yrs64.5
TAP143144Substation-Adjacent230 kV300 MW1.0 yrs63.2
EC Near Cutrale Citrus Juices USA IGreenfield——3.6 yrs61.6
EC Near Cutrale Citrus Juices USA IGreenfield——3.6 yrs61.1
EC Near Cutrale Citrus Juices USA IGreenfield——3.6 yrs60.7
APOPKA SOUTHSubstation-Adjacent69 kV50 MW1.0 yrs60.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.