Henry D King
BrownfieldFt. Pierce, St Lucie, Florida · Fort Pierce Utilities Authority
Henry D King is a natural gas plant in Ft. Pierce, St Lucie, Florida, retired 2008-05-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 142 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Henry D King — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Martin | oil plant | 3,623 | 30.6 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Henry D King
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Henry D King, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MARTIN | Substation-Adjacent | FL | Martin County | 500 kV | 1,000 MW | 1.0 yrs | 68.9 |
| MIDWAY | Substation-Adjacent | FL | St. Lucie County | 500 kV | 1,000 MW | 1.0 yrs | 66.6 |
| SANDPIPER | Substation-Adjacent | FL | St. Lucie County | 230 kV | 300 MW | 1.0 yrs | 63.0 |
| EMERSON | Substation-Adjacent | FL | St. Lucie County | 230 kV | 300 MW | 1.0 yrs | 62.8 |
| UNKNOWN120574 | Substation-Adjacent | FL | St. Lucie County | 230 kV | 300 MW | 1.0 yrs | 62.8 |
| UNKNOWN120592 | Substation-Adjacent | FL | Indian River County | 230 kV | 300 MW | 1.0 yrs | 62.7 |
| UNKNOWN162151 | Substation-Adjacent | FL | Indian River County | 230 kV | 300 MW | 1.0 yrs | 62.6 |
| UNKNOWN120324 | Substation-Adjacent | FL | Indian River County | 230 kV | 300 MW | 1.0 yrs | 62.6 |
See all datacenter sites in Florida →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Henry D King, Ft. Pierce, St Lucie, Florida. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.