Henry D King

Brownfield

Ft. Pierce, St Lucie, Florida · Fort Pierce Utilities Authority

Legacy capacity
142
MW

Henry D King is a natural gas plant in Ft. Pierce, St Lucie, Florida, retired 2008-05-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 142 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity142 MW
Retirement date2008-05-01
EIA plant ID#658

Grid hookup & remediation

Nearest substation0.8 mi
Operator address311 N. Indian River Dr, Ft. Pierce, FL, 34950
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Henry D King — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Martinoil plant3,62330.6 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Henry D King

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Henry D King, ranked by DC Readiness.

Candidate sites near Henry D King
SiteTypeStateCountyVoltageCapacityQueue waitScore
MARTINSubstation-AdjacentFLMartin County500 kV1,000 MW1.0 yrs68.9
MIDWAYSubstation-AdjacentFLSt. Lucie County500 kV1,000 MW1.0 yrs66.6
SANDPIPERSubstation-AdjacentFLSt. Lucie County230 kV300 MW1.0 yrs63.0
EMERSONSubstation-AdjacentFLSt. Lucie County230 kV300 MW1.0 yrs62.8
UNKNOWN120574Substation-AdjacentFLSt. Lucie County230 kV300 MW1.0 yrs62.8
UNKNOWN120592Substation-AdjacentFLIndian River County230 kV300 MW1.0 yrs62.7
UNKNOWN162151Substation-AdjacentFLIndian River County230 kV300 MW1.0 yrs62.6
UNKNOWN120324Substation-AdjacentFLIndian River County230 kV300 MW1.0 yrs62.6

See all datacenter sites in Florida →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Henry D King, Ft. Pierce, St Lucie, Florida. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.