Martin

Brownfield

Indiantown, Martin, Florida · Florida Power & Light Co

Legacy capacity
3,623
MW

Martin is a oil plant in Indiantown, Martin, Florida, retired 2018-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3,623 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity3,623 MW
Retirement date2018-12-01
EIA plant ID#6043

Grid hookup & remediation

Nearest substation3.2 mi
OperatorFlorida Power & Light Co
Operator address21900 SW Warfield Blvd, Indiantown, FL, 34956
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Martin, ranked by DC Readiness.

Candidate sites near Martin
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIDWAYSubstation-AdjacentFLSt. Lucie County500 kV1,000 MW3.6 yrs75.1
RANCHSubstation-AdjacentFLPalm Beach County230 kV300 MW3.6 yrs72.7
UNKNOWN120605Substation-AdjacentFLPalm Beach County230 kV300 MW3.6 yrs72.3
ALEXANDERSubstation-AdjacentFLMartin County230 kV300 MW3.6 yrs71.3
CORBETTSubstation-AdjacentFLPalm Beach County500 kV1,000 MW3.6 yrs71.1
TESOROSubstation-AdjacentFLMartin County230 kV300 MW3.6 yrs70.9
RALLSSubstation-AdjacentFLSt. Lucie County230 kV300 MW3.6 yrs70.9
UNKNOWN150694Substation-AdjacentFLSt. Lucie County230 kV300 MW3.6 yrs70.8

See all datacenter sites in Florida

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.