Clewiston Sugar House

Brownfield

Clewiston, Hendry, Florida · United States Sugar Corp

Legacy capacity
41
MW

Clewiston Sugar House is a former biomass site in Clewiston, Hendry, Florida, retired 2017-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 41 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer biomass site
Site typeretired_plant
Existing capacity41 MW
Retirement date2017-12-01
EIA plant ID#50482

Grid hookup & remediation

Nearest substation3.1 mi
OperatorUnited States Sugar Corp
Operator address1731 South WC Owen Avenue, Clewiston, FL, 33440
Why this site is datacenter-attractive: a former biomass site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Clewiston Sugar House, ranked by DC Readiness.

Candidate sites near Clewiston Sugar House
SiteTypeStateCountyVoltageCapacityQueue waitScore
CORBETTSubstation-AdjacentFLPalm Beach County500 kV1,000 MW3.6 yrs71.1
MARTINSubstation-AdjacentFLMartin County500 kV1,000 MW3.6 yrs69.6
Greenfield (MARTIN - CORBETT)GreenfieldFLMartin County500 kV1,000 MW3.6 yrs67.1
Greenfield (ANDYTOWN - ORANGE RIVER)GreenfieldFLHendry County500 kV1,000 MW3.6 yrs65.1
MartinBrownfieldFLMartin County3,623 MW3.6 yrs64.7
HICPOCHEESubstation-AdjacentFLHendry County138 kV100 MW3.6 yrs63.6
SOUTH BAYSubstation-AdjacentFLPalm Beach County138 kV100 MW3.6 yrs63.1
UNKNOWN108515Substation-AdjacentFLHendry County138 kV100 MW3.6 yrs62.6

See all datacenter sites in Florida

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.