Cudjoe

Brownfield

Cudjoe Key, Monroe, Florida · Utility Board of Key West City

Legacy capacity
5
MW

Cudjoe is a oil plant in Cudjoe Key, Monroe, Florida, retired 2006-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 5 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity5 MW
Retirement date2006-09-01
EIA plant ID#6582

Grid hookup & remediation

Nearest substation1.1 mi
OperatorUtility Board of Key West City
Operator addressBlimp Rd MM 21.5, Cudjoe Key, FL, 33041
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Cudjoe, ranked by DC Readiness.

Candidate sites near Cudjoe
SiteTypeStateCountyVoltageCapacityQueue waitScore
KENNEDY DRIVESubstation-AdjacentFLMonroe County138 kV100 MW3.6 yrs57.5
STOCK ISLANDSubstation-AdjacentFLMonroe County138 kV100 MW3.6 yrs56.1
UNKNOWN150796Substation-AdjacentFLMonroe County138 kV100 MW3.6 yrs55.7
UNKNOWN120079Substation-AdjacentFLMonroe County138 kV100 MW3.6 yrs54.8
Big PineBrownfieldFLMonroe3 MW54.2
Stock IslandBrownfieldFLMonroe8 MW54.1
KEY WESTSubstation-AdjacentFLMonroe County138 kV100 MW3.6 yrs53.5
UNKNOWN120062Substation-AdjacentFLMonroe County138 kV100 MW3.6 yrs52.7

See all datacenter sites in Florida

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Cudjoe, Cudjoe Key, Monroe, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.