Stock Island is a oil plant in Stock Island, Monroe, Florida, retired 2009-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 8 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity8 MW
Retirement date2009-12-01
EIA plant ID#6584

Grid hookup & remediation

Nearest substation0.4 mi
OperatorUtility Board of Key West City
Operator address6900 Front Street Extension, Stock Island, FL, 33041
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Stock Island, ranked by DC Readiness.

Candidate sites near Stock Island
SiteTypeStateCountyVoltageCapacityQueue waitScore
KENNEDY DRIVESubstation-AdjacentFLMonroe County138 kV100 MW3.6 yrs57.5
STOCK ISLANDSubstation-AdjacentFLMonroe County138 kV100 MW3.6 yrs56.1
UNKNOWN150796Substation-AdjacentFLMonroe County138 kV100 MW3.6 yrs55.7
UNKNOWN120079Substation-AdjacentFLMonroe County138 kV100 MW3.6 yrs54.8
Big PineBrownfieldFLMonroe3 MW54.2
Stock IslandBrownfieldFLMonroe8 MW54.1
KEY WESTSubstation-AdjacentFLMonroe County138 kV100 MW3.6 yrs53.5
UNKNOWN120062Substation-AdjacentFLMonroe County138 kV100 MW3.6 yrs52.7

See all datacenter sites in Florida

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Stock Island, Stock Island, Monroe, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.