Big Pine
BrownfieldBig Pine Key, Monroe, Florida · Utility Board of Key West City
Big Pine is a oil plant in Big Pine Key, Monroe, Florida, retired 2006-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Monroe County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Big Pine — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Stock Island | oil plant | 8 | 3.3 mi | — |
| Cudjoe | oil plant | 5 | 0.0 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Big Pine
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Big Pine, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| KENNEDY DRIVE | Substation-Adjacent | FL | Monroe County | 138 kV | 100 MW | 1.0 yrs | 54.6 |
| UNKNOWN120079 | Substation-Adjacent | FL | Monroe County | 138 kV | 100 MW | 1.0 yrs | 54.6 |
| TAP150879 | Substation-Adjacent | FL | Monroe County | 138 kV | 100 MW | 1.0 yrs | 54.6 |
| UNKNOWN120062 | Substation-Adjacent | FL | Monroe County | 138 kV | 100 MW | 1.0 yrs | 54.6 |
| EC Near Cudjoe | Greenfield | FL | Monroe | — | — | 3.6 yrs | 53.9 |
| KEY WEST | Substation-Adjacent | FL | Monroe County | 138 kV | 100 MW | 1.0 yrs | 53.7 |
| UNKNOWN125212 | Substation-Adjacent | FL | Monroe County | 138 kV | 100 MW | 1.0 yrs | 52.8 |
| EC Near Stock Island | Greenfield | FL | Monroe | — | — | 3.6 yrs | 52.3 |
See all datacenter sites in Florida →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Big Pine, Big Pine Key, Monroe, Florida. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.