Portland (FL)
BrownfieldEglin AFB, Walton, Florida · PowerSouth Energy Cooperative
Portland (FL) is a oil plant in Eglin AFB, Walton, Florida, retired 2006-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 11 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Walton County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Get alerts
Track Portland (FL)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Portland (FL), ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SHOAL RIVER | Substation-Adjacent | FL | Okaloosa County | 230 kV | 300 MW | 1.0 yrs | 65.2 |
| DESTIN | Substation-Adjacent | FL | Okaloosa County | 115 kV | 100 MW | 1.0 yrs | 62.1 |
| TAP143122 | Substation-Adjacent | FL | Okaloosa County | 115 kV | 100 MW | 1.0 yrs | 61.8 |
| UNKNOWN120711 | Substation-Adjacent | FL | Okaloosa County | 115 kV | 100 MW | 1.0 yrs | 61.7 |
| VALPARAISO | Substation-Adjacent | FL | Okaloosa County | 115 kV | 100 MW | 1.0 yrs | 61.6 |
| UNKNOWN120949 | Substation-Adjacent | FL | Okaloosa County | 115 kV | 100 MW | 1.0 yrs | 61.5 |
| NICEVILLE | Substation-Adjacent | FL | Okaloosa County | 115 kV | 100 MW | 1.0 yrs | 61.4 |
| LAGUNA BEACH | Substation-Adjacent | FL | Bay County | 230 kV | 300 MW | 1.0 yrs | 61.4 |
Nearby internet exchanges
- BluBroadband Shell AveFort Walton Beach, FL · 1 networks
See all datacenter sites in Florida →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen