Avon Park

Brownfield

Avon Park, Highlands, Florida · Duke Energy Florida, LLC

Legacy capacity
67
MW

Avon Park is a natural gas plant in Avon Park, Highlands, Florida, retired 2020-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 67 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity67 MW
Retirement date2020-10-01
EIA plant ID#624

Grid hookup & remediation

Nearest substation0.0 mi
Operator address1415 South Highlands Avenue, Avon Park, FL, 33829
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Highlands County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)24,364
Construction employment1,882
Land value$5,657/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate12.55¢/kWh
Industrial power rate14.52¢/kWh
Load growth (FERC-714)1.8%

Water & cooling

Water stressLow-Medium
Public water supply7.5 MGD
Industrial water use0.1 MGD
Cooling degree days3,500
Mean annual temp72°F

Hazard, flood & connectivity

FEMA risk index55.0 · Very High
Fiber providers4 · 15% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Avon Park — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Hines Energy Complexnatural gas plant1,03427.2 mi—
Phillipsoil plant4212.3 mi—
Dinner Lakenatural gas plant136.9 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Avon Park

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Avon Park, ranked by DC Readiness.

Candidate sites near Avon Park
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN108701Substation-AdjacentFLPolk County230 kV300 MW1.0 yrs68.4
Brownfield SiteBrownfieldFLHardee County—1,560 MW3.6 yrs67.0
UNKNOWN125381Substation-AdjacentFLPolk County230 kV300 MW1.0 yrs67.0
NORTH BARTOWSubstation-AdjacentFLPolk County230 kV300 MW1.0 yrs66.7
WEST LAKE WALESSubstation-AdjacentFLPolk County230 kV300 MW1.0 yrs66.6
BARCOLASubstation-AdjacentFLPolk County230 kV300 MW1.0 yrs66.5
EC Near Cutrale Citrus Juices USA IIGreenfieldFLPolk——3.6 yrs66.5
OZ PolkGreenfieldFLPolk——3.6 yrs66.3

Nearby internet exchanges

See all datacenter sites in Florida →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Avon Park, Avon Park, Highlands, Florida. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.