Lansing Smith is a coal plant in Southport, Bay, Florida, retired 2016-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 340 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Lansing Smith, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SHAKY JOE SWAMP TAP | Substation-Adjacent | FL | Walton County | 230 kV | 300 MW | 3.7 yrs | 66.6 |
| LONG BEACH | Substation-Adjacent | FL | Bay County | 115 kV | 100 MW | 3.6 yrs | 65.6 |
| UNKNOWN107700 | Substation-Adjacent | FL | Bay County | 115 kV | 100 MW | 3.6 yrs | 65.5 |
| UNKNOWN108172 | Substation-Adjacent | FL | Bay County | 230 kV | 300 MW | 3.7 yrs | 65.3 |
| SHIPYARD | Substation-Adjacent | FL | Bay County | 115 kV | 100 MW | 3.6 yrs | 65.1 |
| UNKNOWN108174 | Substation-Adjacent | FL | Bay County | 115 kV | 100 MW | 3.6 yrs | 65.0 |
| HOLIDAY | Substation-Adjacent | FL | Bay County | 115 kV | 100 MW | 3.6 yrs | 65.0 |
| DEADEND167080 | Substation-Adjacent | FL | Bay County | 115 kV | 100 MW | 3.7 yrs | 64.6 |
See all datacenter sites in Florida →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Lansing Smith, Southport, Bay, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.