Datacenter Sites in Leon County, Florida
Leon County has 74 scored datacenter candidate sites averaging 60.9/100 DC Readiness, with a catalogued aggregate of 4,741 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
74
Candidate sites
60.9/100
Avg DC Readiness
4,741 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
Site-selection context for Leon County
Yessales_tax_exemption
Datacenter tax incentive
12.20¢/kWh
Commercial electricity
8.43¢/kWh
Industrial electricity
9
Fiber providers
Low-Medium
Water stress
$7,248
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
By site type
Top datacenter sites in Leon County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN120742 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 68.0 |
| UNKNOWN120743 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 67.1 |
| LINE 17 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.3 |
| UNKNOWN162146 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 65.1 |
| OZ Leon | Greenfield | — | — | 3.6 yrs | 63.7 |
| UNKNOWN107686 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 63.0 |
| UNKNOWN107679 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 62.5 |
| EC Near Arvah B Hopkins | Greenfield | — | — | 3.6 yrs | 61.6 |
| UNKNOWN121036 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 61.6 |
| UNKNOWN120746 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 61.5 |
| TAP143306 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 61.4 |
| EC Near Arvah B Hopkins | Greenfield | — | — | 3.6 yrs | 61.3 |
| UNKNOWN120747 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 61.2 |
| SUBSTATION 12 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 61.1 |
| UNKNOWN121015 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 61.1 |
| EC Near Arvah B Hopkins | Greenfield | — | — | 3.6 yrs | 61.1 |
| TAP143114 | Substation-Adjacent | 69 kV | 50 MW | 1.0 yrs | 60.9 |
| UNKNOWN120752 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.8 |
| TAP143304 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.6 |
| UNKNOWN121016 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.5 |
| UNKNOWN120750 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.4 |
| TAP167082 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.3 |
| UNKNOWN120754 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.2 |
| SUBSTATION 14 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.2 |
| UNKNOWN120664 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 60.2 |
Leon County datacenter FAQ
- How many datacenter sites are in Leon County?
- 74 scored datacenter candidate sites, averaging 60.9/100 DC Readiness.
- Does Leon County offer datacenter tax incentives?
- Sales tax exemption on manufacturing machinery including servers; no state income tax.
- What is the natural-hazard risk in Leon County?
- FEMA's National Risk Index rates Leon County as "Very High" (score 55).
- What are industrial electricity rates in Leon County?
- Average industrial electricity is 8.43¢/kWh and commercial is 12.20¢/kWh in Leon County.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Leon County, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.