EC Near Arvah B Hopkins

Greenfield

Leon County, Florida · SERC

DC Readiness
61.3
Good / 100

EC Near Arvah B Hopkins is a greenfield datacenter candidate site in Leon County, Florida, interconnecting through SERC. It screens at 61.3/100 DC Readiness and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance3.4 mi
Fiber providers9
Fiber coverage50.0%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance313.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerScott Lester H
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest
Former usenear retired gas plant (10km)

Risk & environment

Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score35/100
Construction cost index86.5 (avg 100)

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance3.4 mi
Nearest rail2.2 mi
Nearest gas pipeline3.9 mi
Nearest fiber route185.3 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.20¢/kWh
Industrial electricity8.43¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$7,248

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
75
Fiber connectivity12%
85
Energy cost10%
89
Water risk8%
84
Natural hazard8%
35
Buildability7%
40
Labor market4%
50
DC cluster4%
80
Land / acreage3%
43
Construction cost3%
78
Gas pipeline2%
88
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Leon County, ranked by DC Readiness.

Sites near EC Near Arvah B Hopkins
SiteTypeVoltageCapacityQueue waitScore
ARVAH B HOPKINSSubstation-Adjacent230 kV300 MW5.8 yrs75.9
LINE 17Substation-Adjacent230 kV300 MW5.8 yrs73.9
Arvah B HopkinsBrownfield441 MW3.6 yrs70.7
UNKNOWN162146Substation-Adjacent230 kV300 MW5.8 yrs70.6
UNKNOWN120743Substation-Adjacent230 kV300 MW5.8 yrs70.5
UNKNOWN121037Substation-Adjacent115 kV100 MW5.8 yrs70.2
UNKNOWN121015Substation-Adjacent115 kV100 MW5.8 yrs70.1
SUBSTATION 14Substation-Adjacent115 kV100 MW5.8 yrs69.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Arvah B Hopkins, Leon County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.