Datacenter Sites in Georgia
Georgia has 3,157 scored datacenter candidate sites averaging 61.8/100 DC Readiness. Substation-Adjacent parcels lead the inventory (1,637 sites). Most sites interconnect through SERC. The state's candidate sites carry a catalogued aggregate of 576.9k MW and average a 4.9 yrs interconnection-queue wait.
By site type
- Substation-Adjacent1,637
- Greenfield968
- Industrial345
- Former Mine185
- Brownfield22
Average sub-score profile
How Georgia's candidate sites score on each DC Readiness dimension (0–100 average).
Top 25 datacenter sites in Georgia
Ranked by DC Readiness.
| Site | Type | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|
| NORTH TIFTON | Substation-Adjacent | Muscogee County | 500 kV | 1,000 MW | 3.7 yrs | 80.5 |
| UNION | Substation-Adjacent | Clayton County | 500 kV | 1,000 MW | 5.8 yrs | 79.9 |
| VILLA RICA | Substation-Adjacent | Douglas County | 500 kV | 1,000 MW | 5.8 yrs | 79.9 |
| BIG SHANTY | Substation-Adjacent | Cobb County | 500 kV | 1,000 MW | 5.8 yrs | 79.9 |
| KLONDIKE | Substation-Adjacent | Rockdale County | 500 kV | 1,000 MW | 5.8 yrs | 79.8 |
| O'HARA | Substation-Adjacent | Henry County | 500 kV | 1,000 MW | 5.8 yrs | 79.7 |
| WIDOWS CREEK 500KV | Substation-Adjacent | Dade County | 500 kV | 1,000 MW | 3.7 yrs | 78.8 |
| WIDOWS CREEK | Substation-Adjacent | Dade County | 500 kV | 1,000 MW | 3.7 yrs | 78.2 |
| WANSLEY COMBINED CYCLE | Substation-Adjacent | Heard County | 500 kV | 1,000 MW | 3.7 yrs | 78.2 |
| BULL SLUICE | Substation-Adjacent | Cobb County | 500 kV | 1,000 MW | 5.8 yrs | 78.1 |
| Jack McDonough | Brownfield | Fulton | — | 598 MW | — | 77.9 |
| UNKNOWN115644 | Substation-Adjacent | Douglas County | 230 kV | 300 MW | 5.8 yrs | 77.1 |
| UNKNOWN111545 | Substation-Adjacent | Fulton County | 230 kV | 300 MW | 5.8 yrs | 77.0 |
| RACCOON MOUNTAIN | Substation-Adjacent | Dade County | 500 kV | 1,000 MW | 3.7 yrs | 76.9 |
| EDWIN I HATCH | Substation-Adjacent | Toombs County | 500 kV | 1,000 MW | 5.8 yrs | 76.9 |
| BIG SHANTY | Substation-Adjacent | Bartow County | 500 kV | 1,000 MW | 3.7 yrs | 76.8 |
| UNKNOWN111355 | Substation-Adjacent | Fulton County | 230 kV | 300 MW | 5.8 yrs | 76.8 |
| H Allen Franklin Combined Cycle | Brownfield | Harris | — | 688 MW | — | 76.5 |
| UNKNOWN111533 | Substation-Adjacent | Fulton County | 230 kV | 300 MW | 5.8 yrs | 76.5 |
| UNKNOWN111350 | Substation-Adjacent | Fulton County | 230 kV | 300 MW | 5.8 yrs | 76.5 |
| UNKNOWN115783 | Substation-Adjacent | Monroe County | 500 kV | 1,000 MW | 3.7 yrs | 76.4 |
| UNKNOWN115702 | Substation-Adjacent | Heard County | 500 kV | 1,000 MW | 3.7 yrs | 76.4 |
| THALMANN | Substation-Adjacent | Glynn County | 500 kV | 1,000 MW | 3.7 yrs | 76.4 |
| UNKNOWN151327 | Substation-Adjacent | Fulton County | 230 kV | 300 MW | 5.8 yrs | 76.4 |
| BONAIRE | Substation-Adjacent | Houston County | 500 kV | 1,000 MW | 5.8 yrs | 76.3 |
Counties in Georgia
152 counties with five or more scored sites.
Georgia datacenter site selection FAQ
- How many datacenter sites are in Georgia?
- GridCensus catalogs 3,157 scored datacenter candidate sites in Georgia, with an average DC Readiness score of 61.8/100.
- What is the average interconnection-queue wait in Georgia?
- Candidate sites in Georgia average a 4.9 yrs interconnection-queue wait, with an average queue depth of 23 projects.
- What kind of datacenter sites are most common in Georgia?
- Substation-Adjacent sites are the most common category in Georgia (1,637 sites), and most sites fall within the SERC grid region.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.