Datacenter Sites in Putnam, Georgia

Putnam has 14 scored datacenter candidate sites averaging 57.5/100 DC Readiness, with a catalogued aggregate of 1,500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Putnam, Georgia has 14 scored datacenter candidate sites averaging 57.5/100 DC Readiness, roughly in line with the Georgia average of 57.1. It ranks 55th of 130 Georgia counties by number of sites and 44th by average score. The top-scoring site is Substation-Adjacent site · b377e976 at 65.4/100.

14
Candidate sites
57.5/100
Avg DC Readiness
1,500 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 14 in Putnam

Site-selection context for Putnam

Yessales_tax_exemption
Datacenter tax incentive
12.87¢/kWh
Commercial electricity
7.30¢/kWh
Industrial electricity
7
Fiber providers
Low-Medium
Water stress
$4,713
Land price / acre
2,200
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

How does Putnam compare with other counties in Georgia?

By number of scored sites, Putnam ranks 55th of the 130 Georgia counties with a county page, holding 0.6% of the state's 2,478 sites. Its average DC Readiness of 57.5/100 ranks 44th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2089th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 10 score 55 or higher.

What types of datacenter sites are in Putnam?

Greenfield sites are the most common (9, 64% of the county's inventory), followed by substation-adjacent (4) and former mine (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Putnam?

Industrial electricity averages 7.30¢/kWh and commercial 12.87¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (40). WRI water stress is low-medium. 7 fiber providers report service in the county. The climate runs 2,200 cooling degree days a year with a mean temperature of 64°F. Land is valued around $4,713 an acre.

By site type

Top datacenter sites in Putnam

Top datacenter sites in Putnam
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN113527Substation-Adjacent230 kV300 MW5.8 yrs65.4
UNKNOWN113529Substation-Adjacent230 kV300 MW5.8 yrs62.5
UNKNOWN158160Substation-Adjacent230 kV300 MW5.8 yrs62.1
UNKNOWN113528Substation-Adjacent230 kV300 MW5.8 yrs61.8
EC Near Harllee BranchGreenfield——5.8 yrs58.6
EC Coal Putnam CountyGreenfield——5.8 yrs57.3
EC Near Harllee BranchGreenfield——5.8 yrs57.3
Greenfield (HARLLEE BRANCH - UNKNOWN113529)Greenfield230 kV300 MW5.8 yrs56.3
EC Near Harllee BranchGreenfield——5.8 yrs55.9
EC Coal Putnam CountyGreenfield——5.8 yrs55.6
EC Coal Putnam CountyGreenfield——5.8 yrs54.9
EC Near Harllee BranchGreenfield——5.8 yrs54.8
Mine SiteFormer Mine——5.8 yrs51.6
EC Near Harllee BranchGreenfield——5.8 yrs50.9

Every scored site in Putnam

All 14 sites, best first.

Putnam datacenter FAQ

How many datacenter sites are in Putnam?

14 scored datacenter candidate sites, averaging 57.5/100 DC Readiness. That is the 55th-most of 130 Georgia counties with five or more sites.

What is the highest-scoring datacenter site in Putnam?

Substation-Adjacent site · b377e976 scores 65.4/100 DC Readiness, the highest of the 14 scored sites in Putnam (a substation-adjacent site).

Does Putnam offer datacenter tax incentives?

Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

What is the natural-hazard risk in Putnam?

FEMA's National Risk Index rates Putnam as "Relatively High" (score 40).

What are industrial electricity rates in Putnam?

Average industrial electricity is 7.30¢/kWh and commercial is 12.87¢/kWh in Putnam.

More in Georgia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Putnam, Georgia”, https://gridcensus.com/datacenter-sites/georgia/putnam (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Putnam, Georgia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.