Greenfield (UNKNOWN115783 - BONAIRE)

Greenfield

Crawford County, Georgia · SERC

DC Readiness
59.4
Good / 100

At a glance

Greenfield (UNKNOWN115783 - BONAIRE) is a greenfield datacenter candidate site in Crawford County, Georgia, scoring 59.4/100 DC Readiness — 2nd of 3 scored sites in the county. Its nearest substation is UNKNOWN115783. It sits in the SERC grid region and the GEORGIA POWER CO service territory, where interconnection has averaged 5.8 years from request to operation. GridCensus catalogs 1,000 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN115783
Substation voltage500 kV
Available capacity1,000 MW
UtilityGEORGIA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWPSC large-load rules (≥100 MW): direct-pay contracts · 15 yr

Speed to power

Interconnection outlookConstrained
≈ 5.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionSERC
Queue depth1
Avg queue wait5.8 yrs
Recent queue wait5.8 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDLI One
IXP distance61.7 mi
Fiber providers4
Fiber coverage97.6%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score60/100

Location context

Nearest datacenterMeta DC
DC distance60.5 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.84¢/kWh
Industrial electricity8.47¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$5,223

Regulatory climate

Favorablestate posture · as of 2026-08

Active incentives; Georgia Power courts large load with bring-your-own clean-energy options.

DC tax incentiveYes
Large-load threshold≥ 100 MW

Georgia Power billing/contract rules apply to very large loads.

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 2 nearby

Get alerts

Track Greenfield (UNKNOWN115783 - BONAIRE)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Greenfield (UNKNOWN115783 - BONAIRE) compare with other sites in Crawford County?

Greenfield (UNKNOWN115783 - BONAIRE) ranks 2nd of 3 scored candidate sites in Crawford County. Its 59.4/100 is roughly in line with the county average of 57.2. It is roughly in line with the Georgia average of 57.1 and about 12% above the national average of 53.2.

Against the Georgia average, its strongest sub-score is power availability (72 vs 50) and its weakest is fiber connectivity (70 vs 73). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Greenfield (UNKNOWN115783 - BONAIRE) to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN115783, is the closest grid connection point on record and operates at 500 kV. For connectivity, the nearest internet exchange facility is DLI One at 61.7 miles. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Meta DC, 60.5 miles away.

What are the flood, water and hazard risks at Greenfield (UNKNOWN115783 - BONAIRE)?

At the county level, FEMA's National Risk Index rates Crawford County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power20%
55
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
80
Natural hazard6%
60
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
15

Nearby comparable sites

Other scored datacenter candidate sites in Crawford County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN115783 - BONAIRE)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN113560Substation-Adjacent230 kV300 MW5.8 yrs61.9
Greenfield (UNKNOWN113938 - UNKNOWN157036)Greenfield115 kV100 MW5.8 yrs50.3

Greenfield (UNKNOWN115783 - BONAIRE): common questions

What is the DC Readiness score of Greenfield (UNKNOWN115783 - BONAIRE)?

Greenfield (UNKNOWN115783 - BONAIRE) scores 59.4/100 on the GridCensus DC Readiness scale, rated good. It ranks 2nd of 3 scored sites in Crawford County. The Crawford County average is 57.2 and the Georgia average is 57.1.

What is the nearest substation to Greenfield (UNKNOWN115783 - BONAIRE)?

The nearest mapped substation is UNKNOWN115783, at 500 kV. GridCensus catalogs 1,000 MW of candidate capacity for the site.

Which electric utility serves Greenfield (UNKNOWN115783 - BONAIRE)?

GEORGIA POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is SOUTHERN COMPANY.

What grid region is Greenfield (UNKNOWN115783 - BONAIRE) in?

Greenfield (UNKNOWN115783 - BONAIRE) is in the SERC region. Projects interconnecting there have averaged a 5.8-year wait from queue request to operation.

How far is Greenfield (UNKNOWN115783 - BONAIRE) from an internet exchange?

The nearest internet exchange facility is DLI One, about 61.7 miles away; 4 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Greenfield (UNKNOWN115783 - BONAIRE), Crawford County, GA”, https://gridcensus.com/datacenter-sites/georgia/crawford-county/greenfield-unknown115783-bonaire-a6af60cb (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (UNKNOWN115783 - BONAIRE), Crawford County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.