Mitchell has 19 scored datacenter candidate sites averaging 55.4/100 DC Readiness, with a catalogued aggregate of 2,000 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
Mitchell, Georgia has 19 scored datacenter candidate sites averaging 55.4/100 DC Readiness, roughly in line with the Georgia average of 57.1. It ranks 37th of 130 Georgia counties by number of sites and 89th by average score. The top-scoring site is RACCOON CREEK at 64.4/100.
Site-selection context for Mitchell
Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.
How does Mitchell compare with other counties in Georgia?
By number of scored sites, Mitchell ranks 37th of the 130 Georgia counties with a county page, holding 0.8% of the state's 2,478 sites. Its average DC Readiness of 55.4/100 ranks 89th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1783rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 10 score 55 or higher.
What types of datacenter sites are in Mitchell?
Greenfield sites are the most common (11, 58% of the county's inventory), followed by substation-adjacent (4) and industrial (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Mitchell?
Industrial electricity averages 11.49¢/kWh and commercial 13.35¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (40). WRI water stress is low-medium. 5 fiber providers report service in the county. The climate runs 2,200 cooling degree days a year with a mean temperature of 64°F. Land is valued around $4,002 an acre.
By site type
Top datacenter sites in Mitchell
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| RACCOON CREEK | Substation-Adjacent | 500 kV | 1,000 MW | 5.8 yrs | 64.4 |
| UNKNOWN111118 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 61.0 |
| UNKNOWN111117 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 61.0 |
| EC Near Baconton Power Plant | Greenfield | — | — | 5.8 yrs | 57.5 |
| OZ Mitchell | Greenfield | — | — | 5.8 yrs | 57.3 |
| EC Near Baconton Power Plant | Greenfield | — | — | 5.8 yrs | 57.1 |
| EC Near Baconton Power Plant | Greenfield | — | — | 5.8 yrs | 56.2 |
| UNKNOWN111121 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 55.6 |
| EC Near Baconton Power Plant | Greenfield | — | — | 5.8 yrs | 55.1 |
| EC Near Baconton Power Plant | Greenfield | — | — | 5.8 yrs | 55.1 |
| EC Near Baconton Power Plant | Greenfield | — | — | 5.8 yrs | 54.8 |
| OZ Mitchell | Greenfield | — | — | 5.8 yrs | 54.5 |
| OZ Mitchell | Greenfield | — | — | 5.8 yrs | 54.3 |
| Greenfield (RACCOON CREEK - UNKNOWN177142) | Greenfield | 230 kV | 300 MW | 5.8 yrs | 53.7 |
| EC Near Baconton Power Plant | Greenfield | — | — | 5.8 yrs | 52.5 |
| Former Brown's Service Station | Industrial | — | — | 5.8 yrs | 50.8 |
| Former Glausier Street Gas Station | Industrial | — | — | 5.8 yrs | 50.8 |
| Former Brown's Service Station | Industrial | — | — | 5.8 yrs | 50.8 |
| Former Chicken Delight | Industrial | — | — | 5.8 yrs | 50.8 |
Every scored site in Mitchell
All 19 sites, best first.
- RACCOON CREEK · 64.4
- Substation-Adjacent site · ed4d3a33 · 61.0
- Substation-Adjacent site · ab26b9eb · 61.0
- EC Near Baconton Power Plant · f6644670 · 57.5
- OZ Mitchell · 8d13df08 · 57.3
- EC Near Baconton Power Plant · b5c977cb · 57.1
- EC Near Baconton Power Plant · bbd9a085 · 56.2
- Substation-Adjacent site · 15a7e771 · 55.6
- EC Near Baconton Power Plant · ae3f29bd · 55.1
- EC Near Baconton Power Plant · 5b12402a · 55.1
- EC Near Baconton Power Plant · c3ad5f4a · 54.8
- OZ Mitchell · ee33d63c · 54.5
- OZ Mitchell · 03bcb812 · 54.3
- Greenfield (RACCOON CREEK - UNKNOWN177142) · 53.7
- EC Near Baconton Power Plant · e9681db9 · 52.5
- Former Brown's Service Station · b037b2cc · 50.8
- Former Glausier Street Gas Station · 50.8
- Former Brown's Service Station · 9548b761 · 50.8
- Former Chicken Delight · 50.8
Mitchell datacenter FAQ
How many datacenter sites are in Mitchell?
19 scored datacenter candidate sites, averaging 55.4/100 DC Readiness. That is the 37th-most of 130 Georgia counties with five or more sites.
What is the highest-scoring datacenter site in Mitchell?
RACCOON CREEK scores 64.4/100 DC Readiness, the highest of the 19 scored sites in Mitchell (a substation-adjacent site).
Does Mitchell offer datacenter tax incentives?
Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.
What is the natural-hazard risk in Mitchell?
FEMA's National Risk Index rates Mitchell as "Relatively High" (score 40).
What are industrial electricity rates in Mitchell?
Average industrial electricity is 11.49¢/kWh and commercial is 13.35¢/kWh in Mitchell.
More in Georgia
- All datacenter sites in Georgia· 2,478 sites
- Operating datacenters in Georgia
- Electric substations in Georgia
- Fulton County· 202 sites · avg 58.8
- DeKalb County· 72 sites · avg 61.6
- Bibb County· 67 sites · avg 54.2
- Cobb County· 63 sites · avg 62.3
- Glynn County· 55 sites · avg 53.7
- Richmond County· 54 sites · avg 59.5
- Greenfield sites in Georgia
- Substation-Adjacent sites in Georgia
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Mitchell, Georgia”, https://gridcensus.com/datacenter-sites/georgia/mitchell (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Mitchell, Georgia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.