Mitchell has 19 scored datacenter candidate sites averaging 55.4/100 DC Readiness, with a catalogued aggregate of 2,000 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Mitchell, Georgia has 19 scored datacenter candidate sites averaging 55.4/100 DC Readiness, roughly in line with the Georgia average of 57.1. It ranks 37th of 130 Georgia counties by number of sites and 89th by average score. The top-scoring site is RACCOON CREEK at 64.4/100.

19
Candidate sites
55.4/100
Avg DC Readiness
2,000 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 19 in Mitchell

Site-selection context for Mitchell

Yessales_tax_exemption
Datacenter tax incentive
13.35¢/kWh
Commercial electricity
11.49¢/kWh
Industrial electricity
5
Fiber providers
Low-Medium
Water stress
$4,002
Land price / acre
2,200
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

How does Mitchell compare with other counties in Georgia?

By number of scored sites, Mitchell ranks 37th of the 130 Georgia counties with a county page, holding 0.8% of the state's 2,478 sites. Its average DC Readiness of 55.4/100 ranks 89th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1783rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 10 score 55 or higher.

What types of datacenter sites are in Mitchell?

Greenfield sites are the most common (11, 58% of the county's inventory), followed by substation-adjacent (4) and industrial (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Mitchell?

Industrial electricity averages 11.49¢/kWh and commercial 13.35¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (40). WRI water stress is low-medium. 5 fiber providers report service in the county. The climate runs 2,200 cooling degree days a year with a mean temperature of 64°F. Land is valued around $4,002 an acre.

By site type

Top datacenter sites in Mitchell

Top datacenter sites in Mitchell
SiteTypeVoltageCapacityQueue waitScore
RACCOON CREEKSubstation-Adjacent500 kV1,000 MW5.8 yrs64.4
UNKNOWN111118Substation-Adjacent230 kV300 MW5.8 yrs61.0
UNKNOWN111117Substation-Adjacent230 kV300 MW5.8 yrs61.0
EC Near Baconton Power PlantGreenfield——5.8 yrs57.5
OZ MitchellGreenfield——5.8 yrs57.3
EC Near Baconton Power PlantGreenfield——5.8 yrs57.1
EC Near Baconton Power PlantGreenfield——5.8 yrs56.2
UNKNOWN111121Substation-Adjacent115 kV100 MW5.8 yrs55.6
EC Near Baconton Power PlantGreenfield——5.8 yrs55.1
EC Near Baconton Power PlantGreenfield——5.8 yrs55.1
EC Near Baconton Power PlantGreenfield——5.8 yrs54.8
OZ MitchellGreenfield——5.8 yrs54.5
OZ MitchellGreenfield——5.8 yrs54.3
Greenfield (RACCOON CREEK - UNKNOWN177142)Greenfield230 kV300 MW5.8 yrs53.7
EC Near Baconton Power PlantGreenfield——5.8 yrs52.5
Former Brown's Service StationIndustrial——5.8 yrs50.8
Former Glausier Street Gas StationIndustrial——5.8 yrs50.8
Former Brown's Service StationIndustrial——5.8 yrs50.8
Former Chicken DelightIndustrial——5.8 yrs50.8

Every scored site in Mitchell

All 19 sites, best first.

Mitchell datacenter FAQ

How many datacenter sites are in Mitchell?

19 scored datacenter candidate sites, averaging 55.4/100 DC Readiness. That is the 37th-most of 130 Georgia counties with five or more sites.

What is the highest-scoring datacenter site in Mitchell?

RACCOON CREEK scores 64.4/100 DC Readiness, the highest of the 19 scored sites in Mitchell (a substation-adjacent site).

Does Mitchell offer datacenter tax incentives?

Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

What is the natural-hazard risk in Mitchell?

FEMA's National Risk Index rates Mitchell as "Relatively High" (score 40).

What are industrial electricity rates in Mitchell?

Average industrial electricity is 11.49¢/kWh and commercial is 13.35¢/kWh in Mitchell.

More in Georgia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Mitchell, Georgia”, https://gridcensus.com/datacenter-sites/georgia/mitchell (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Mitchell, Georgia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.