UNKNOWN111117

Substation-Adjacent

Mitchell, Georgia · SERC

DC Readiness
64.5
Good / 100

UNKNOWN111117 is a substation-adjacent datacenter candidate site in Mitchell, Georgia, interconnecting through SERC. It screens at 64.5/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN111117
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityGEORGIA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWPSC large-load rules (≥100 MW): direct-pay contracts · 15 yr

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance50.2 mi
Fiber providers5
Fiber coverage63.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score60/100

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance50.2 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.35¢/kWh
Industrial electricity11.49¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$4,002

Regulatory climate

Favorablestate posture · as of 2026-08

Active incentives; Georgia Power courts large load with bring-your-own clean-energy options.

DC tax incentiveYes
Large-load threshold≥ 100 MW

Georgia Power billing/contract rules apply to very large loads.

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN111117

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
73
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
80
Natural hazard6%
60
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
15

Nearby comparable sites

Other scored datacenter candidate sites in Mitchell, ranked by DC Readiness.

Sites near UNKNOWN111117
SiteTypeVoltageCapacityQueue waitScore
RACCOON CREEKSubstation-Adjacent500 kV1,000 MW1.0 yrs68.0
UNKNOWN111118Substation-Adjacent230 kV300 MW1.0 yrs64.5
EC Near Baconton Power PlantGreenfield——5.8 yrs60.4
OZ MitchellGreenfield——5.8 yrs60.2
EC Near Baconton Power PlantGreenfield——5.8 yrs60.0
EC Near Baconton Power PlantGreenfield——5.8 yrs59.1
UNKNOWN111121Substation-Adjacent115 kV100 MW1.0 yrs59.1
EC Near Baconton Power PlantGreenfield——5.8 yrs58.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.