Datacenter Sites in Washington, Georgia
Washington has 18 scored datacenter candidate sites averaging 56.0/100 DC Readiness, with a catalogued aggregate of 2,200 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
Washington, Georgia has 18 scored datacenter candidate sites averaging 56.0/100 DC Readiness, roughly in line with the Georgia average of 57.1. It ranks 39th of 130 Georgia counties by number of sites and 75th by average score. The top-scoring site is WARTHEN SUBSTATION at 65.1/100.
Site-selection context for Washington
Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.
How does Washington compare with other counties in Georgia?
By number of scored sites, Washington ranks 39th of the 130 Georgia counties with a county page, holding 0.7% of the state's 2,478 sites. Its average DC Readiness of 56.0/100 ranks 75th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1835th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 13 score 55 or higher.
What types of datacenter sites are in Washington?
Substation-Adjacent sites are the most common (11, 61% of the county's inventory), followed by former mine (4) and greenfield (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Washington?
Industrial electricity averages 7.28¢/kWh and commercial 12.08¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (40). WRI water stress is low-medium. 6 fiber providers report service in the county. The climate runs 2,200 cooling degree days a year with a mean temperature of 64°F. Land is valued around $2,691 an acre.
By site type
Top datacenter sites in Washington
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| WARTHEN SUBSTATION | Substation-Adjacent | 500 kV | 1,000 MW | 5.8 yrs | 65.1 |
| UNKNOWN113405 | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 61.2 |
| OZ Washington | Greenfield | — | — | 5.8 yrs | 59.3 |
| TAP142350 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 56.9 |
| UNKNOWN116826 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 56.9 |
| TAP142355 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 56.9 |
| UNKNOWN113408 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 56.9 |
| TAP142359 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 56.9 |
| TAP161825 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 56.9 |
| UNKNOWN113407 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 56.9 |
| UNKNOWN113404 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 56.7 |
| OZ Washington | Greenfield | — | — | 5.8 yrs | 56.7 |
| UNKNOWN113409 | Substation-Adjacent | 115 kV | 100 MW | 5.8 yrs | 56.3 |
| Sandersville Downtown Cafe | Industrial | — | — | 5.8 yrs | 51.0 |
| Mine Site | Former Mine | — | — | 5.8 yrs | 51.0 |
| Mine Site | Former Mine | — | — | 5.8 yrs | 50.9 |
| Mine Site | Former Mine | — | — | 5.8 yrs | 50.6 |
| Mine Site | Former Mine | — | — | 5.8 yrs | 50.6 |
Every scored site in Washington
All 18 sites, best first.
- WARTHEN SUBSTATION · 65.1
- Substation-Adjacent site · 56aac46a · 61.2
- OZ Washington · 0ab7ebb9 · 59.3
- Substation-Adjacent site · 503e8432 · 56.9
- Substation-Adjacent site · 631c93d2 · 56.9
- Substation-Adjacent site · e8bd4bc5 · 56.9
- Substation-Adjacent site · 31558792 · 56.9
- Substation-Adjacent site · 39d89f42 · 56.9
- Substation-Adjacent site · 3acb5701 · 56.9
- Substation-Adjacent site · 66f7c7e8 · 56.9
- Substation-Adjacent site · 10fe39f4 · 56.7
- OZ Washington · 374bd40f · 56.7
- Substation-Adjacent site · 5ec49684 · 56.3
- Sandersville Downtown Cafe · 51.0
- Mine Site · bb6c628e · 51.0
- Mine Site · aca759fa · 50.9
- Mine Site · 8824fea8 · 50.6
- Mine Site · c65dcb57 · 50.6
Washington datacenter FAQ
How many datacenter sites are in Washington?
18 scored datacenter candidate sites, averaging 56.0/100 DC Readiness. That is the 39th-most of 130 Georgia counties with five or more sites.
What is the highest-scoring datacenter site in Washington?
WARTHEN SUBSTATION scores 65.1/100 DC Readiness, the highest of the 18 scored sites in Washington (a substation-adjacent site).
Does Washington offer datacenter tax incentives?
Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.
What is the natural-hazard risk in Washington?
FEMA's National Risk Index rates Washington as "Relatively High" (score 40).
What are industrial electricity rates in Washington?
Average industrial electricity is 7.28¢/kWh and commercial is 12.08¢/kWh in Washington.
More in Georgia
- All datacenter sites in Georgia· 2,478 sites
- Operating datacenters in Georgia
- Electric substations in Georgia
- Fulton County· 202 sites · avg 58.8
- DeKalb County· 72 sites · avg 61.6
- Bibb County· 67 sites · avg 54.2
- Cobb County· 63 sites · avg 62.3
- Glynn County· 55 sites · avg 53.7
- Richmond County· 54 sites · avg 59.5
- Substation-Adjacent sites in Georgia
- Former Mine sites in Georgia
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Washington, Georgia”, https://gridcensus.com/datacenter-sites/georgia/washington (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Washington, Georgia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.