QTS
DatacenteractiveGA · Quality Technology Services
QTS is an operating datacenter facility in GA, operated by Quality Technology Services. It spans approximately 227,238 square feet. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Facility
Nearby internet exchanges
- Digital Realty ATL (56 Marietta)Atlanta, GA · 191 networks
- Digital Realty ATL (250 Williams)Atlanta, GA · 72 networks
- CoreSite - Atlanta (AT1)Atlanta, GA · 70 networks
- Equinix AT1 - AtlantaAtlanta, GA · 58 networks
- Equinix AT2/AT3 - AtlantaAtlanta, GA · 24 networks
Other datacenters nearby
- Google Datacenter - Douglas CountyGoogle · GA
- QTS Atlanta Data Center 1Quality Technology Services · Atlanta, GA
- QTSQuality Technology Services · Fayetteville, GA
- Digital Realty Atlanta ATL11Digital Realty · GA
- Flexential Atlanta - Douglasville 2Flexential · Douglasville, GA
Nearby datacenter candidate sites
Scored candidate sites near QTS, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| VILLA RICA | Substation-Adjacent | GA | Douglas County | 500 kV | 1,000 MW | 5.8 yrs | 79.9 |
| UNION | Substation-Adjacent | GA | Clayton County | 500 kV | 1,000 MW | 5.8 yrs | 79.9 |
| KLONDIKE | Substation-Adjacent | GA | Rockdale County | 500 kV | 1,000 MW | 5.8 yrs | 79.8 |
| O'HARA | Substation-Adjacent | GA | Henry County | 500 kV | 1,000 MW | 5.8 yrs | 79.7 |
| Jack McDonough | Brownfield | GA | Fulton | — | 598 MW | — | 77.9 |
| UNKNOWN115644 | Substation-Adjacent | GA | Douglas County | 230 kV | 300 MW | 5.8 yrs | 77.1 |
| UNKNOWN111545 | Substation-Adjacent | GA | Fulton County | 230 kV | 300 MW | 5.8 yrs | 77.0 |
| UNKNOWN111355 | Substation-Adjacent | GA | Fulton County | 230 kV | 300 MW | 5.8 yrs | 76.8 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for QTS, GA. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.