Skip to content
Gridcensus

EAST WATKINSVILLE

Substation-Adjacent

Oconee County, Georgia · SERC

DC Readiness
61.3
Good / 100

At a glance

EAST WATKINSVILLE is a substation-adjacent datacenter candidate site in Oconee County, Georgia, scoring 61.3/100 DC Readiness — 1st of 4 scored sites in the county. Its nearest substation is EAST WATKINSVILLE (0 mi, 230 kV). It sits in the SERC grid region and the GEORGIA POWER CO service territory, where interconnection has averaged 5.8 years from request to operation. GridCensus catalogs 300 MW of candidate capacity here.

Power & interconnection

Nearest substationEAST WATKINSVILLE
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityGEORGIA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWPSC large-load rules (≥100 MW): direct-pay contracts · 15 yr

Speed to power

Interconnection outlookConstrained
≈ 5.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionSERC
Queue depth1
Avg queue wait5.8 yrs
Recent queue wait5.8 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPQTS Atlanta-Suwanee (SUW1)
IXP distance40.6 mi
Fiber providers4
Fiber coverage47.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score60/100

Location context

Nearest datacenterMeta DC
DC distance25.4 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.81¢/kWh
Industrial electricity6.90¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$6,873

Regulatory climate

Favorablestate posture · as of 2026-08

Active incentives; Georgia Power courts large load with bring-your-own clean-energy options.

DC tax incentiveYes
Large-load threshold≥ 100 MW

Georgia Power billing/contract rules apply to very large loads.

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 3 nearby

Get alerts

Track EAST WATKINSVILLE

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EAST WATKINSVILLE compare with other sites in Oconee County?

EAST WATKINSVILLE ranks 1st of 4 scored candidate sites in Oconee County. Its 61.3/100 is roughly in line with the county average of 59.0. It is roughly in line with the Georgia average of 57.1 and about 15% above the national average of 53.2.

Against the Georgia average, its strongest sub-score is power availability (78 vs 50) and its weakest is fiber connectivity (63 vs 73). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EAST WATKINSVILLE to power, fiber and other datacenters?

The nearest mapped substation, EAST WATKINSVILLE, is about 0 miles away and operates at 230 kV. For connectivity, the nearest internet exchange facility is QTS Atlanta-Suwanee (SUW1) at 40.6 miles. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Meta DC, 25.4 miles away.

What are the flood, water and hazard risks at EAST WATKINSVILLE?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Oconee County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
55
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
80
Natural hazard6%
60
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
15

Nearby comparable sites

Other scored datacenter candidate sites in Oconee County, ranked by DC Readiness.

Sites near EAST WATKINSVILLE
SiteTypeVoltageCapacityQueue waitScore
BETHABARASubstation-Adjacent230 kV300 MW5.8 yrs61.2
MARS HILLSubstation-Adjacent115 kV100 MW5.8 yrs56.7
UNKNOWN154626Substation-Adjacent115 kV100 MW5.8 yrs56.6

EAST WATKINSVILLE: common questions

What is the DC Readiness score of EAST WATKINSVILLE?

EAST WATKINSVILLE scores 61.3/100 on the GridCensus DC Readiness scale, rated good. It ranks 1st of 4 scored sites in Oconee County. The Oconee County average is 59.0 and the Georgia average is 57.1.

What is the nearest substation to EAST WATKINSVILLE?

The nearest mapped substation is EAST WATKINSVILLE, about 0 miles away, at 230 kV. GridCensus catalogs 300 MW of candidate capacity for the site.

Which electric utility serves EAST WATKINSVILLE?

GEORGIA POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is SOUTHERN COMPANY.

What grid region is EAST WATKINSVILLE in?

EAST WATKINSVILLE is in the SERC region. Projects interconnecting there have averaged a 5.8-year wait from queue request to operation.

Is EAST WATKINSVILLE in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

How far is EAST WATKINSVILLE from an internet exchange?

The nearest internet exchange facility is QTS Atlanta-Suwanee (SUW1), about 40.6 miles away; 4 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EAST WATKINSVILLE, Oconee County, GA”, https://gridcensus.com/datacenter-sites/georgia/oconee-county/east-watkinsville-10dcd8ab (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EAST WATKINSVILLE, Oconee County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.