DC Readiness
54.2
Fair / 100

At a glance

OZ Ben Hill is a greenfield datacenter candidate site in Ben Hill, Georgia, scoring 54.2/100 DC Readiness — 4th of 4 scored sites in the county. It sits in the SERC grid region and the GEORGIA POWER CO service territory, where interconnection has averaged 5.8 years from request to operation.

Power & interconnection

Utility commercial rate0.12¢/kWh
UtilityGEORGIA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWPSC large-load rules (≥100 MW): direct-pay contracts · 15 yr

Speed to power

Interconnection outlookConstrained
≈ 5.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionSERC
Queue depth1
Avg queue wait5.8 yrs
Recent queue wait5.8 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance114.5 mi
Fiber providers5
Fiber coverage78.3%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance206.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerGEORGIA POWER CO
Land contactBen Hill County Assessor
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest

Risk & environment

Environmental constraintModerate (40/100)
Flood zoneZone A (SFHA)
Water stress (WRI)1.00
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score35/100
Construction cost index67.2 (avg 100)

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance114.5 mi
Nearest rail5.3 mi
Nearest gas pipeline10.6 mi
Nearest fiber route79.5 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.65¢/kWh
Industrial electricity7.10¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$3,024

Regulatory climate

Favorablestate posture · as of 2026-08

Active incentives; Georgia Power courts large load with bring-your-own clean-energy options.

DC tax incentiveYes
Large-load threshold≥ 100 MW

Georgia Power billing/contract rules apply to very large loads.

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 3 nearby

Get alerts

Track OZ Ben Hill

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does OZ Ben Hill compare with other sites in Ben Hill?

OZ Ben Hill ranks 4th of 4 scored candidate sites in Ben Hill. Its 54.2/100 is roughly in line with the county average of 55.8. It is roughly in line with the Georgia average of 57.1 and roughly in line with the national average of 53.2.

Against the Georgia average, its strongest sub-score is water (81 vs 80) and its weakest is natural hazard (35 vs 59). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is OZ Ben Hill to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is EdgeConneX Tallahassee (EDCTAL01) at 114.5 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is EdgeConneX Tallahassee (EDCTAL01), 114.5 miles away.

What are the flood, water and hazard risks at OZ Ben Hill?

The site is in FEMA flood zone A, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding. WRI rates baseline water stress at 1.00 on a 0–5 scale. Mapped wetlands (National Wetlands Inventory) are present on the parcel. At the county level, FEMA's National Risk Index rates Ben Hill "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
68
Energy cost10%
89
Water risk7%
81
Natural hazard6%
35
Buildability7%
40
Labor market4%
50
DC cluster4%
20
Land / acreage3%
47
Construction cost3%
94
Gas pipeline2%
66
Tax incentive1%
100
Climate / cooling1%
15

Nearby comparable sites

Other scored datacenter candidate sites in Ben Hill, ranked by DC Readiness.

Sites near OZ Ben Hill
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN116847Substation-Adjacent115 kV100 MW5.8 yrs56.4
UNKNOWN111750Substation-Adjacent115 kV100 MW5.8 yrs56.4
UNKNOWN111755Substation-Adjacent115 kV100 MW5.8 yrs56.3

OZ Ben Hill: common questions

What is the DC Readiness score of OZ Ben Hill?

OZ Ben Hill scores 54.2/100 on the GridCensus DC Readiness scale, rated fair. It ranks 4th of 4 scored sites in Ben Hill. The Ben Hill average is 55.8 and the Georgia average is 57.1.

Which electric utility serves OZ Ben Hill?

GEORGIA POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is SOUTHERN COMPANY.

What grid region is OZ Ben Hill in?

OZ Ben Hill is in the SERC region. Projects interconnecting there have averaged a 5.8-year wait from queue request to operation.

Is OZ Ben Hill in a flood zone?

The site is in FEMA flood zone A, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding.

Who owns OZ Ben Hill?

Parcel records list the owner as GEORGIA POWER CO (private land).

How far is OZ Ben Hill from an internet exchange?

The nearest internet exchange facility is EdgeConneX Tallahassee (EDCTAL01), about 114.5 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “OZ Ben Hill, Ben Hill, GA”, https://gridcensus.com/datacenter-sites/georgia/ben-hill/oz-ben-hill-4fe60b39 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for OZ Ben Hill, Ben Hill is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.