Skip to content
Gridcensus

Datacenter Sites in FREDERICK, Virginia

FREDERICK has 93 scored datacenter candidate sites averaging 55.5/100 DC Readiness, with a catalogued aggregate of 6,600 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

93
Candidate sites
55.5/100
Avg DC Readiness
6,600 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in FREDERICK

Site-selection context for FREDERICK

Yessales_tax_exemption
Datacenter tax incentive
12.20¢/kWh
Commercial electricity
8.97¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$7,861
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in FREDERICK

Top datacenter sites in FREDERICK
SiteTypeVoltageCapacityQueue waitScore
OZ FrederickGreenfield3.1 yrs62.8
CHEMSTONE CORP. (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing3.5 yrs55.3
STOWE-WOODWARD, INC. (ALL OTHER RUBBER PRODUCT MANUFACTURING)Manufacturing3.5 yrs55.2
VALLEY TRADER (PREPRESS SERVICES)Manufacturing3.5 yrs55.2
FISHER DIAGNOSTICS (IN-VITRO DIAGNOSTIC SUBSTANCE MANUFACTURING)Manufacturing3.5 yrs55.2
TABARD CORP. (OTHER SNACK FOOD MANUFACTURING)Manufacturing3.5 yrs55.2
CRIDER & SHOCKEY, INC. (READY-MIX CONCRETE MANUFACTURING)Manufacturing3.5 yrs54.5
MASONITE INTERNATIONAL CORP. (WOOD WINDOW AND DOOR MANUFACTURING)Manufacturing3.5 yrs54.5
CIVES STEEL CO., MID-ATLANTIC DIV. (IRON AND STEEL MILLS)Manufacturing3.5 yrs54.5
SOUTHEASTERN CONTAINER, INC. (PLASTICS BOTTLE MANUFACTURING)Manufacturing3.5 yrs54.5
WORLD WIDE AUTOMOTIVE, INC. (OTHER MOTOR VEHICLE ELECTRICAL AND ELECTRONIC EQUIPMENT MANUFACTURING)Manufacturing3.5 yrs54.5
KRAFT FOODS, INC. (FLAVORING SYRUP AND CONCENTRATE MANUFACTURING)Manufacturing3.5 yrs54.5
SHOCKEY PRECAST GROUP, THE (OTHER CONCRETE PRODUCT MANUFACTURING)Manufacturing3.5 yrs54.5
MONOFLO INTERNATIONAL, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing3.5 yrs54.4
GREEN BAY PACKAGING, INC. (COATED AND LAMINATED PAPER MANUFACTURING)Manufacturing3.5 yrs54.4
KINGSDOWN, INC. (MATTRESS MANUFACTURING)Manufacturing3.5 yrs54.4
GARBER ICE CREAM CO., INC. (ICE CREAM AND FROZEN DESSERT MANUFACTURING)Manufacturing3.5 yrs54.4
BARBER & ROSS CO. (WOOD WINDOW AND DOOR MANUFACTURING)Manufacturing3.5 yrs54.4
TREX CO., INC. (CUTLERY AND FLATWARE (EXCEPT PRECIOUS) MANUFACTURING)Manufacturing3.5 yrs54.4
TOTAL MOLDING CONCEPTS, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing3.5 yrs54.4
NW WORKS, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing3.5 yrs54.4
COMMERCIAL PRESS, INC. (OTHER COMMERCIAL PRINTING)Manufacturing3.5 yrs54.4
VALLEY REDI-MIX CO., INC. (READY-MIX CONCRETE MANUFACTURING)Manufacturing3.5 yrs54.4
NEW WORLD PASTA CO. (DRY PASTA MANUFACTURING)Manufacturing3.5 yrs54.4
DK INDUSTRIAL SERVICES (IRON AND STEEL MILLS)Manufacturing3.5 yrs54.4

FREDERICK datacenter FAQ

How many datacenter sites are in FREDERICK?
93 scored datacenter candidate sites, averaging 55.5/100 DC Readiness.
Does FREDERICK offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in FREDERICK?
FEMA's National Risk Index rates FREDERICK as "Relatively Moderate" (score 30).
What are industrial electricity rates in FREDERICK?
Average industrial electricity is 8.97¢/kWh and commercial is 12.20¢/kWh in FREDERICK.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FREDERICK, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.